New Hampshire · Division 08
Openings projects in New Hampshire · page 3
Glazing, curtain wall, storefront, doors, hardware. Usually specified by the architect. Counted across our 300 highest-priority scored New Hampshire projects, 217 need this division and 192 are still in planning or permitting.
As of 2026-11-03, 217 of the 300 highest-scored New Hampshire projects in the SpecIndex index need openings, and 192 of those are still in planning or permitting.
Search the full index →Showing 101–150 of 217 · page 3 of 5
- View specs →H145--Boiler HW & Distributed Systems Compliance
Manchester
- View specs →H145--Control Systems Engineering Support Services Manchester VAMCplanning
Manchester
- View specs →H145--Hot Water Distributed Systems & Boiler Programplanning
Manchester
- View specs →H941--36C24123Q0253 HVAC Diagnostic Assessment - Radiologyplanning
Manchester
- View specs →H941--Radiology HVAC Diagnostic Condition Assessment
Manchester
- View specs →Heating System Upgrade, Franklin Falls Project Office, Franklin, NHdeadline not recorded
Franklin
- View specs →Hydraulic Pump Controllers/ Replacement of Internal Wiring, Blackwater Dam, Webster, NHdeadline not recorded
Webster
- View specs →Installation Wireless Fire Alarm Master Box System CRRELunder construction
Hanover
- View specs →J036--Elevator Maintenance Contract | Manchester
Manchester
- View specs →J040--608-23-1-4808-0006 Semi-Annual Elevator Inspection & Certification- Service Contract (VA-23-00009819)
Manchester
- View specs →J041--MRI Cooling Systemsplanning
Manchester
- View specs →J041--MRI Temporary Cooling Unit
Manchester
- View specs →J041--Solicitation for Manchester Boiler Testing and Inspection service
Manchester
- View specs →J044--Boiler/Burner Tuning and Emergency and Non-Emergency Repairs
Manchester
- View specs →J044--PM Services for Boiler Plant at the Manchester VAMC
Manchester
- View specs →J044--PM Services for Boiler Plant with optionsplanning
Manchester
- View specs →J044--SCADA Control System Services
Manchester
- View specs →J045--36C24122Q0223 Manchester HVAC Maintenance Service
Manchester
- View specs →J045--608-22-2-4808-0084 HVAC Maintenance Serviceplanning
Manchester
- View specs →J045--Annual Boiler Inspection and Services
Manchester
- View specs →J045--Annual Boiler Inspection and Services Due Date Extensionto 01/05/2024
Manchester
- View specs →J045--Boiler Plant Safety Reliability
Manchester
- View specs →J045--Boiler Plant Safety Reliability Due Date Extended to 01/05/2024
Manchester
- View specs →J045--HVAC Maintenance Serviceplanning
Manchester
- View specs →J045--HVAC PM and Svcplanning
Manchester
- View specs →J045--Preventative Maintenance For HVAC, Compressed Air, and Medical Air/Vacuum Manchester VAMCplanning
Manchester
- View specs →J045-- req FORCE 5/8---HVAC PM and Svc heating, ventilating and air
Manchester
- View specs →J045--Steam Boiler Water Chemical Treatment and Testing
Manchester
- View specs →J061--HVAC Maintenance
Manchester
- View specs →JOB ORDER CONTRACT - Construction - Region A - NY (with exceptions), MA, ME, VT, NH, RI, & parts of PA
Londonderry
- View specs →Life Size Minuteman Statue
NEWINGTON
- View specs →Load Frame Relocation
Hanover
- View specs →Modernize Base-wide Fire Alarm System, NH Air National Guard, Pease Air National Guard Base, Newington, NHdeadline not recorded
Newington
- View specs →N045--Replace Steam Hot Water Heater Building 7planning
Manchester
- View specs →N045--Suspended Pumps Replacement Servicesplanning
Manchester
- View specs →New Boston Multiple Award Construction Contract (MACC) IDIQplanning
New Boston
- View specs →New Boston Space Force Station Public Announcement System
New Boston
- View specs →New Hampshire JCC-Site Drainage and Gym Floor
Manchester
- View specs →Norris Cotton Upper Parking Deck Coating Replacement in Manchester, NH
Manchester
- View specs →Notice of Intent to Sole Source - WMF Chilled Water Loop System Integrationplanning
Campton
- View specs →Office Mold and Asbestos Remediation, Merrimack River Basin Office, Hopkinton, NHdeadline not recorded
Hopkinton
- View specs →Oshkosh Water Pumpplanning
Portsmouth
- View specs →Overhead Door Replacement
Newington
- View specs →P400--608-22-114 - Bldg #2,3,4,5,13 & 14 Demolition Construction
Manchester
- View specs →Pease ANGB Airshow Fencing
Portsmouth
- View specs →Presolicitation: Cold Regions Research and Engineering Laboratory (CRREL) Mobility Lab Building Upgrades
33860
- View specs →Process Glycol Re-Piping
Hanover
- View specs →Process Water Re-Piping
Hanover
- View specs →Project Office Roof Replacement & Epoxy Floors, Surry Mountain Lake, Surry, NHdeadline not recorded
Surry
- View specs →PROPOSAL DEADLINE NOW 06 NOVEMBER 2018 AT 1PM EASTERN STD TIMEPERIOD OF PERFORMANCE EXTENDED TO 180 DAYS
KEENE