New Mexico · Division 08
Openings projects in New Mexico · page 2
Glazing, curtain wall, storefront, doors, hardware. Usually specified by the architect. Counted across our 300 highest-priority scored New Mexico projects, 91 need this division and 74 are still in planning or permitting.
As of 2026-11-03, 91 of the 300 highest-scored New Mexico projects in the SpecIndex index need openings, and 74 of those are still in planning or permitting.
Search the full index →Showing 51–91 of 91 · page 2 of 2
- View specs →(Amend 0004) Design Bid Build NC3 Support WRM Storage/Shipping Facility at Holloman Air Force Base, New Mexico
Holloman AFB
- View specs →Amendment 0004, Design Bid Build, ERCIP Micro-Grid, White Sands Missile Range, NM
White Sands Missile Range
- View specs →CNS Fire Department on the Northwest Development Area (NWDA), Melrose Air Force Range (MAFR), Roosevelt County, NM
Cannon AFB
- View specs →Construct 4G Cancer Center Project -San Antonio, Texas (VA-21-00030263)
San Antonio
- View specs →GALLUP FEDERAL BLDG- Fire Alarm System Upgrade
Gallup
- View specs →Install Beacon Lighting
Cannon AFB
- View specs →Mescalero Indian Hospital Expansion & Renovationunder construction
Mescalero
- View specs →POST AWARD NOTICE for 36C25820B0015 - Upgrade IT Closet Storage Areas, Project 501-17-110, New Mexico VA Healthcare Syst
Albuquerque
- View specs →White Sands Missile Range Job Order Contract Industry Dayplanning
White Sands Missile Range
- View specs →WSMR - Paintings of Various Buildings
White Sands Missile Range
- View specs →WSMR Renovations Building 126
White Sands Missile Range
- View specs →ACS Control Upgradesunder construction
Cannon AFB
- View specs →GAOA Coyote Roof Replacement
Coyote
- View specs →Wash Rack Utility Connectionunder construction
Kirtland AFB
- View specs →56--BLM-NM RFO COMANCHE OXBOW FENCING INSTALLATIONunder construction
Roswell
- View specs →Sandia District Vehicle Gate Replacement
Tijeras
- View specs →Video Audio Camera Installation - New Sunrise Regional Treatment Center (NSRTC)under construction
Zuni
- View specs →Voice and Paging Infrastructure for New Sunrise Regional Treatment Center (NSRTC)under construction
Zuni
- View specs →27 SOCES Vertical Transportation Equipment (VTE) Servicesplanning
Cannon AFB
- Award announcement for; Two Phase Design Build MQ-9 Formal Training Unit (FTU) Ops Facility, Holloman Air Force Base (HAunder construction
Holloman AFB · $50M-$100M
- View specs →DC Battery Replacement/Disposal
- View specs →HVAC Repairs for Northern Navajo Medical Center
Shiprock
- NOTICE OF INTENT TO APPLY BRAND NAME DESCRIPTIONS AND SPECIFICATIONS: Design Bid Build FY18 Dangerous Cargo Pad and Combplanning
Cannon AFB · $50M-$100M
- View specs →Renovate Secure Facility B1049
Kirtland AFB
- View specs →TDAC-WSMR Installation of Motion Sensors
- View specs →Y--Datil Well CG Double Vault Toilet Socorro Field Ofunder construction
- View specs →Y--SFO BUCK FIRE BAER FENCE
- View specs →Z--SMOKEY CIRCLE RTU HVAC REPLACEMENT
Grants
- FY23 MISSILE ASSEMBLY SUPPORT BUILDING TACTICAL EQUIPMENT MAINTENACE FACILITY (TEMF), WHITE SANDS MISSILE RANGE (WSMR),
White Sands Missile Range · $10M-$50M
- View specs →HVAC Repairs
Shiprock
- View specs →NNMC Fire Pump Emergency Call-Back Services
Shiprock
- View specs →Dona Ana Base Camp Expansion - OT Feasibility & Business Feedbackplanning
Chaparral
- View specs →Gila NF Wilderness Ranger District Roof Replacement
Mimbres
- Igf::Ot::Igf Design Build Construction Services For Repair Hangar 1080 Qf-16 At Holloman Afb, Nm Project: Kwrd11-0023completed
· $10M-$50M
- View specs →Wall Painting Services
Holloman Air Force Base
- Award Notice - W912PP24C0007 DESIGN BID BUILD FY 23 CONSTRUCT INTEGRATION LAB (REVIL), KIRTLAND AIR FORCE BASE, BERNALILunder construction
0 · $1M-$10M
- Chestnut Infrastructure Improvements, Kirtland Air Force Base (KAFB), Bernalillo County, New Mexicounder construction
Albuquerque · $1M-$10M
- View specs →Dishwasher Replacement B9436
- View specs →HVAC Repair Services
Chaparral
- Narrow Band Test Facility, White Sands Missile Range, New Mexicounder construction
· $1M-$10M
- View specs →Sources Sought (ISBEE and Small Business Concerns) - Purchase Elevator and Preventive Maintenance Services (PMS)planning
Shiprock