Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Oklahoma projects, 74 need this division and 1 are still in planning or permitting.

As of 2026-11-03, 74 of the 300 highest-scored Oklahoma projects in the SpecIndex index need concrete, and 1 of those are still in planning or permitting.

Search the full index →

Showing 1–50 of 74 · page 1 of 2

  • Stephenson Taylor Waterline Extensionplanning

    · Under $1M

  • Replace Steam Bolts And Install Mixing Valves Matocunder construction

    · $1M-$10M

  • Requirement: All Works Associated With Providing A Complete Engineering Design And Construction Phasing/Planning Packageunder construction

    · $1M-$10M

  • Current Low Water Crossing Failed To Support Passage Of Grounds Equipment Due To Apparent Structural Degradation And Posunder construction

    · Under $1M

  • Project Title: Fort Gibson 480V Switchgear Replacementunder construction

    · $1M-$10M

  • Marietta, Ok - Tower & Fence Replacement At Marietta (Qxk), Ok (Buec) In Accordance With The Sow And Drawings.under construction

    · Under $1M

  • Perform Keystone Tainter Gate Repairs In Accordance With Plans And Specifications.under construction

    · $1M-$10M

  • Synar Aml Reclamation Constructionunder construction

    · $1M-$10M

  • Chic 240631 Construct Water Treatment Plant And Maintenance Buildingunder construction

    · $1M-$10M

  • Webbers Falls Tainter Gate Replacement - Webbers Falls, Muskogee County, Okunder construction

    · $10M-$50M

  • Construction Of An Ammunition Demolition Facility At Mcalester Army Ammunition Plant, Pittsburg Co., Oklahoma.under construction

    · $50M-$100M

  • Construction Services For Project Ok Np Multi Pms(1), Pavement Preservation Oklahoma And Tx Np Multi Pms(2), Pavement Prunder construction

    · $10M-$50M

  • Fort Gibson Replace Spillway Bridgeunder construction

    · $50M-$100M

  • Ok-Tishomingo Nfh-Replace Kettles 6 & 7completed

    · Under $1M

  • Construct A New Law Atct At The Lawton Fort-Sill Regional Airport In Lawton, Okunder construction

    · $50M-$100M

  • Design And Construction Of The Kc-46A Maintenance Hangar At Tinker Afb, Oklahoma.completed

    · $100M+

  • Fy23 Kc-46A 2-Bay Pdm Hangar At Tinker Air Force Base, Oklahoma.under construction

    · $100M+

  • Igf::Ot::Igf Construct Kc-46A Two Bay Hangar At Tinker Afb, Okcompleted

    · $100M+

  • Vtol Performance And Analysis Range (Vpar) Construction At The Mike Monroney Aeronautical Centerunder construction

    · $1M-$10M

  • Wd Mayo Alignment Cell (Previously W912Bv25R0008)under construction

    · $1M-$10M

  • Wd Mayo Tainter Gate Repairunder construction

    · $10M-$50M

  • Design And Construction Of The Kc-46A Depot Maintenance Hangar On The Kc-46A Campus At Tinker Afb, Oklahoma.completed

    · $50M-$100M

  • Design And Construction Of The Kc-46A Fuel Maintenance Hangar On The Kc-46A Campus At Tinker Afb, Oklahoma.completed

    · $50M-$100M

  • Design Build Construction Services For Repair Airborne Warning And Control System Apron Phase Ii, Repair West Air Logistunder construction

    · $10M-$50M

  • Heyburn Toe Drain Repairsunder construction

    · Under $1M

  • Mpb Renovationscompleted

    · $50M-$100M

  • Vance Afb Center Runway Repaircompleted

    · $50M-$100M

  • 2025 Altus Maccunder construction

    · $1M-$10M

  • Cami Wiwaves New Facility Wo#14-002117completed

    · $10M-$50M

  • Construct E-3G Flight Training Simulator Facility Tinker Afbcompleted

    · $10M-$50M

  • Construct Surgical Intensive Care Unit (Sicu) And Renovate Operating Rooms (Or) Okvamc, Oklahoma City, Okunder construction

    · $10M-$50M

  • Dfac Constructioncompleted

    · $10M-$50M

  • Ehrm Infrastructure Upgradesunder construction

    · $10M-$50M

  • Ehrm Infrastructure Upgrades Muskogee Vamcunder construction

    · $10M-$50M

  • Fy22 And Fy23 Kc46-A Pavements At Tinker Afb, Oklahomaunder construction

    · $10M-$50M

  • Igf::Ot::Igf - Sustainment Repair And Maintenance Acquisition Task Order Contract (Satoc)Design-Build For Repair Awacs Acompleted

    · $10M-$50M

  • Kitting Facility Construction For The Kc-46 Program.completed

    · $10M-$50M

  • Lexington Aasf Repairsunder construction

    · $1M-$10M

  • Pmxg: Test Cell 12 Renovationcompleted

    · $10M-$50M

  • Project Requires Demolition Tenkiller Bridge In Sequoyah County, Design/Construction Of Temporary Electrical And Safety under construction

    · $10M-$50M

  • The U.S. Army Corps Of Engineers Is Seeking Proposals For Repairing The Deteriorated Condition Of The Stilling Basins Atunder construction

    · $1M-$10M

  • Award To Design-Build An Administrative Building And Shop Complex At Wichita Mountains Wildlife Refuge.completed

    · $10M-$50M

  • Building 9001 Roof Repair/Replacement Project (7 Sections) Tinker Air Force Base, Oklahomacompleted

    · $10M-$50M

  • Call To Add Lump Sum Funding For Project Number Ok22-20I 133387 Under The Pawnee Field Office, Indian Health Services (Iunder construction

    · Under $1M

  • Call To Add Lump Sum Funding For Project Ok25-G04-142883 ($30,0000.00) And Ok25-Y50-143025 ($30,000.00) Under The Clintounder construction

    · Under $1M

  • Call To Add Lump Sum Funding For Various Project Numbers Under The Miami Field Office, Indian Health Services (Ihs).under construction

    · Under $1M

  • Commercial Vehicle Inspection Facilitycompleted

    · $10M-$50M

  • Construction Of 10Th Flight Test Squadron Operations Bldg. - Tinker Afbcompleted

    · $10M-$50M

  • Design-Build Construction Services Under The Regional Engineering And Construction Contract (Rec) Central Region To Repacompleted

    · $10M-$50M

  • Igf::Ot::Igf Design Build Tinker Afb Air Traffic Control Tower.completed