As of 2026-11-03, 74 of the 300 highest-scored Oklahoma projects in the SpecIndex index need concrete, and 1 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 74 · page 1 of 2
- Stephenson Taylor Waterline Extensionplanning
· Under $1M
- Replace Steam Bolts And Install Mixing Valves Matocunder construction
· $1M-$10M
- Requirement: All Works Associated With Providing A Complete Engineering Design And Construction Phasing/Planning Packageunder construction
· $1M-$10M
- Current Low Water Crossing Failed To Support Passage Of Grounds Equipment Due To Apparent Structural Degradation And Posunder construction
· Under $1M
- Project Title: Fort Gibson 480V Switchgear Replacementunder construction
· $1M-$10M
- Marietta, Ok - Tower & Fence Replacement At Marietta (Qxk), Ok (Buec) In Accordance With The Sow And Drawings.under construction
· Under $1M
- Perform Keystone Tainter Gate Repairs In Accordance With Plans And Specifications.under construction
· $1M-$10M
- Synar Aml Reclamation Constructionunder construction
· $1M-$10M
- Chic 240631 Construct Water Treatment Plant And Maintenance Buildingunder construction
· $1M-$10M
- Webbers Falls Tainter Gate Replacement - Webbers Falls, Muskogee County, Okunder construction
· $10M-$50M
- Construction Of An Ammunition Demolition Facility At Mcalester Army Ammunition Plant, Pittsburg Co., Oklahoma.under construction
· $50M-$100M
- Construction Services For Project Ok Np Multi Pms(1), Pavement Preservation Oklahoma And Tx Np Multi Pms(2), Pavement Prunder construction
· $10M-$50M
- Fort Gibson Replace Spillway Bridgeunder construction
· $50M-$100M
- Ok-Tishomingo Nfh-Replace Kettles 6 & 7completed
· Under $1M
- Construct A New Law Atct At The Lawton Fort-Sill Regional Airport In Lawton, Okunder construction
· $50M-$100M
- Design And Construction Of The Kc-46A Maintenance Hangar At Tinker Afb, Oklahoma.completed
· $100M+
- Fy23 Kc-46A 2-Bay Pdm Hangar At Tinker Air Force Base, Oklahoma.under construction
· $100M+
- Igf::Ot::Igf Construct Kc-46A Two Bay Hangar At Tinker Afb, Okcompleted
· $100M+
- Vtol Performance And Analysis Range (Vpar) Construction At The Mike Monroney Aeronautical Centerunder construction
· $1M-$10M
- Wd Mayo Alignment Cell (Previously W912Bv25R0008)under construction
· $1M-$10M
- Wd Mayo Tainter Gate Repairunder construction
· $10M-$50M
- Design And Construction Of The Kc-46A Depot Maintenance Hangar On The Kc-46A Campus At Tinker Afb, Oklahoma.completed
· $50M-$100M
- Design And Construction Of The Kc-46A Fuel Maintenance Hangar On The Kc-46A Campus At Tinker Afb, Oklahoma.completed
· $50M-$100M
- Design Build Construction Services For Repair Airborne Warning And Control System Apron Phase Ii, Repair West Air Logistunder construction
· $10M-$50M
- Heyburn Toe Drain Repairsunder construction
· Under $1M
- Mpb Renovationscompleted
· $50M-$100M
- Vance Afb Center Runway Repaircompleted
· $50M-$100M
- 2025 Altus Maccunder construction
· $1M-$10M
- Cami Wiwaves New Facility Wo#14-002117completed
· $10M-$50M
- Construct E-3G Flight Training Simulator Facility Tinker Afbcompleted
· $10M-$50M
- Construct Surgical Intensive Care Unit (Sicu) And Renovate Operating Rooms (Or) Okvamc, Oklahoma City, Okunder construction
· $10M-$50M
- Dfac Constructioncompleted
· $10M-$50M
- Ehrm Infrastructure Upgradesunder construction
· $10M-$50M
- Ehrm Infrastructure Upgrades Muskogee Vamcunder construction
· $10M-$50M
- Fy22 And Fy23 Kc46-A Pavements At Tinker Afb, Oklahomaunder construction
· $10M-$50M
- Igf::Ot::Igf - Sustainment Repair And Maintenance Acquisition Task Order Contract (Satoc)Design-Build For Repair Awacs Acompleted
· $10M-$50M
- Kitting Facility Construction For The Kc-46 Program.completed
· $10M-$50M
- Lexington Aasf Repairsunder construction
· $1M-$10M
- Pmxg: Test Cell 12 Renovationcompleted
· $10M-$50M
- Project Requires Demolition Tenkiller Bridge In Sequoyah County, Design/Construction Of Temporary Electrical And Safety under construction
· $10M-$50M
- The U.S. Army Corps Of Engineers Is Seeking Proposals For Repairing The Deteriorated Condition Of The Stilling Basins Atunder construction
· $1M-$10M
- Award To Design-Build An Administrative Building And Shop Complex At Wichita Mountains Wildlife Refuge.completed
· $10M-$50M
- Building 9001 Roof Repair/Replacement Project (7 Sections) Tinker Air Force Base, Oklahomacompleted
· $10M-$50M
- Call To Add Lump Sum Funding For Project Number Ok22-20I 133387 Under The Pawnee Field Office, Indian Health Services (Iunder construction
· Under $1M
- Call To Add Lump Sum Funding For Project Ok25-G04-142883 ($30,0000.00) And Ok25-Y50-143025 ($30,000.00) Under The Clintounder construction
· Under $1M
- Call To Add Lump Sum Funding For Various Project Numbers Under The Miami Field Office, Indian Health Services (Ihs).under construction
· Under $1M
- Commercial Vehicle Inspection Facilitycompleted
· $10M-$50M
- Construction Of 10Th Flight Test Squadron Operations Bldg. - Tinker Afbcompleted
· $10M-$50M
- Design-Build Construction Services Under The Regional Engineering And Construction Contract (Rec) Central Region To Repacompleted
· $10M-$50M
- Igf::Ot::Igf Design Build Tinker Afb Air Traffic Control Tower.completed