Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Oklahoma projects, 77 need this division and 1 are still in planning or permitting.
As of 2026-11-03, 77 of the 300 highest-scored Oklahoma projects in the SpecIndex index need concrete, and 1 of those are still in planning or permitting.
Search the full index →Showing 51–77 of 77 · page 2 of 2
- Oklahoma City Va Health Care System Parking Garage 2under construction
· $10M-$50M
- Repair Solid Contact Clarifierscompleted
· $10M-$50M
- The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Necunder construction
· $10M-$50M
- Tulsa Air National Guard Fuel Storage Facilitycompleted
· $10M-$50M
- Award Of The Base And Options 1-5 For Buildings 455, 462, 461, 467, 475, 463 Via Prc W44Xgq51962985under construction
· $1M-$10M
- Call To Add Lump Sum Funding For Project Number Ok22-20I 133387 Under The Pawnee Field Office, Indian Health Services (Iunder construction
· Under $1M
- Call To Add Lump Sum Funding For Project Ok25-G04-142883 ($30,0000.00) And Ok25-Y50-143025 ($30,000.00) Under The Clintounder construction
· Under $1M
- Construction For New Bor Waterline, Tinker Afb, Okcompleted
· $10M-$50M
- Dedicated Outdoor Repair Unit Repairs At Ft. Sill, Oklahomacompleted
· $10M-$50M
- Design And Construction For The Conversion Of Building 3162 At Fort Sill, Oklahoma.completed
· $1M-$10M
- Fort Sill Fy25 Roof Package 5 - W44Xgq52123814under construction
· $1M-$10M
- Igf::Ot::Igf Replace Airfield Lighting Cable Infrastructurecompleted
· $1M-$10M
- Mcalester Aap Fueling System Repairscompleted
· $1M-$10M
- Pmxg F135 B3234 Upgrades & Correlationunder construction
· $1M-$10M
- Repair Fuel Tanks 273, 331, 965, 998, 3710 & 21090, Api 653 Repairs Of Aboveground Storage Tanks Tinker Afbunder construction
· $10M-$50M
- Repair Tainter Valves At Chouteau, Newt Graham, And W.D. Mayo Locks And Dams, Oklahoma.under construction
· $1M-$10M
- The Intent Of The Project Is To Repair/Replace Roofing Systems On Buildings 3030, 1953, 5030, 5031, 3260, 4100, 6033, Anunder construction
· $1M-$10M
- The Intent Of The Project Is To Repair The Laminated Shingle Roofing Systems On Building 1950, To Repair The Existing Counder construction
· $1M-$10M
- The Intent Of The Project Is To Replace The Existing Flat Roofing Systems On Buildings 707, 730, 751, And To Replace Brounder construction
· $1M-$10M
- Veterans Affair Full Facility Generator At Muskogee, Okcompleted
· $10M-$50M
- W44Xgq52063481 The Intent Of The Project Is To Replace The Existing Flat Roofing Systems On Building 840 And 1490, And Tunder construction
· $1M-$10M
- 19-035903 Vtd Mech-Elec Upgradescompleted
· $1M-$10M
- 20-042069 Mobile Test Bed Facilitycompleted
· $1M-$10M
- 52Nd Street Avb Installationcompleted
· $1M-$10M
- Call To Add Lump Sum Funding For Project Ok25-G07-142884 Under The Miami Field Office, Indian Health Services (Ihs).under construction
· Under $1M
- Call To Add Lump Sum Funding For Various Project Numbers Under The Lawton Field Office, Indian Health Services (Ihs).under construction
· Under $1M
- Call To Add Lump Sum Funding For Various Project Numbers Under The Lawton Field Office, Indian Health Services (Ihs).under construction