Oklahoma · Division 23

HVAC projects in Oklahoma · page 3

Heating, cooling, ventilation, chillers, VRF. Usually specified by the mechanical engineer. Counted across our 300 highest-priority scored Oklahoma projects, 168 need this division and 77 are still in planning or permitting.

As of 2026-11-03, 168 of the 300 highest-scored Oklahoma projects in the SpecIndex index need hvac, and 77 of those are still in planning or permitting.

Search the full index →

Showing 101–150 of 168 · page 3 of 4

  • 2025 Altus Maccunder construction

    · $1M-$10M

  • Cami Wiwaves New Facility Wo#14-002117completed

    · $10M-$50M

  • Construct E-3G Flight Training Simulator Facility Tinker Afbcompleted

    · $10M-$50M

  • Construct Surgical Intensive Care Unit (Sicu) And Renovate Operating Rooms (Or) Okvamc, Oklahoma City, Okunder construction

    · $10M-$50M

  • Dfac Constructioncompleted

    · $10M-$50M

  • DFAC for AIT Barracks , Ft. Sill, OKunder construction

    Fort Sill · $10M-$50M

  • Ehrm Infrastructure Upgradesunder construction

    · $10M-$50M

  • Ehrm Infrastructure Upgrades Muskogee Vamcunder construction

    · $10M-$50M

  • Electrical Pad Site Preparation

    Oklahoma City

    View specs →
  • Fy22 And Fy23 Kc46-A Pavements At Tinker Afb, Oklahomaunder construction

    · $10M-$50M

  • Heyburn Toe Drain Repairsunder construction

    · Under $1M

  • HVAC Replacement/Repair Base-wide

    Tulsa

    View specs →
  • Igf::Ot::Igf - Sustainment Repair And Maintenance Acquisition Task Order Contract (Satoc)Design-Build For Repair Awacs Acompleted

    · $10M-$50M

  • Inspect & Test the Electrical Power Distribution Systemplanning

    View specs →
  • Kitting Facility Construction For The Kc-46 Program.completed

    · $10M-$50M

  • Overhead Door (Modified COTS)

    Tinker AFB

    View specs →
  • Pmxg: Test Cell 12 Renovationcompleted

    · $10M-$50M

  • Project Requires Demolition Tenkiller Bridge In Sequoyah County, Design/Construction Of Temporary Electrical And Safety under construction

    · $10M-$50M

  • The U.S. Army Corps Of Engineers Is Seeking Proposals For Repairing The Deteriorated Condition Of The Stilling Basins Atunder construction

    · $1M-$10M

  • 138th FW Base Wide Electrical Repairs

    Tulsa

    View specs →
  • Award To Design-Build An Administrative Building And Shop Complex At Wichita Mountains Wildlife Refuge.completed

    · $10M-$50M

  • Building 9001 Roof Repair/Replacement Project (7 Sections) Tinker Air Force Base, Oklahomacompleted

    · $10M-$50M

  • Call To Add Lump Sum Funding For Various Project Numbers Under The Miami Field Office, Indian Health Services (Ihs).under construction

    · Under $1M

  • Commercial Vehicle Inspection Facilitycompleted

    · $10M-$50M

  • Construction Of 10Th Flight Test Squadron Operations Bldg. - Tinker Afbcompleted

    · $10M-$50M

  • Crane Services with Operator IDIQ

    Oklahoma City

    View specs →
  • Design-Build Construction Services Under The Regional Engineering And Construction Contract (Rec) Central Region To Repacompleted

    · $10M-$50M

  • Equipment Removal from DLA Distribution Oklahoma City, Ok

    View specs →
  • IFPC/M-SHORAD Instructional Facilityplanning

    Fort Sill

    View specs →
  • Igf::Ot::Igf Design Build Tinker Afb Air Traffic Control Tower.completed

    · $10M-$50M

  • Keystone Power Plant Generator Rewindcompleted

    · $10M-$50M

  • Lexington Aasf Repairsunder construction

    · $1M-$10M

  • Lower Hillside Stabilization And Parking Remediation.completed

    · $10M-$50M

  • Notice of Intent to Award via Sole Source - Circa Inc.planning

    Tinker AFB

    View specs →
  • Oklahoma City Va Health Care System Parking Garage 2under construction

    · $10M-$50M

  • Repair Solid Contact Clarifierscompleted

    · $10M-$50M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Necunder construction

    · $10M-$50M

  • Tulsa Air National Guard Fuel Storage Facilitycompleted

    · $10M-$50M

  • Award Of The Base And Options 1-5 For Buildings 455, 462, 461, 467, 475, 463 Via Prc W44Xgq51962985under construction

    · $1M-$10M

  • Base-wide Overhead Doors Repair

    Tulsa

    View specs →
  • Call To Add Lump Sum Funding For Project Number Ok22-20I 133387 Under The Pawnee Field Office, Indian Health Services (Iunder construction

    · Under $1M

  • Call To Add Lump Sum Funding For Project Ok25-G04-142883 ($30,0000.00) And Ok25-Y50-143025 ($30,000.00) Under The Clintounder construction

    · Under $1M

  • Construction For New Bor Waterline, Tinker Afb, Okcompleted

    · $10M-$50M

  • Construction Services For Ord And R6 Lab Consolidation Task Order 3 Bid Package 2.completed

    · $1M-$10M

  • Dedicated Outdoor Repair Unit Repairs At Ft. Sill, Oklahomacompleted

    · $10M-$50M

  • Design And Construction For The Conversion Of Building 3162 At Fort Sill, Oklahoma.completed

    · $1M-$10M

  • Fort Sill Fy25 Roof Package 5 - W44Xgq52123814under construction

    · $1M-$10M

  • Furnish and Install Storm Shelters on Capehart Housing, Vance AFB, OK

    View specs →
  • Igf::Ot::Igf Replace Airfield Lighting Cable Infrastructurecompleted

    · $1M-$10M

  • Mcalester Aap Fueling System Repairscompleted

    · $1M-$10M