Lighting, switchgear, generators, distribution. Usually specified by the electrical engineer. Counted across our 300 highest-priority scored Oregon projects, 292 need this division and 71 are still in planning or permitting.

As of 2026-11-03, 292 of the 300 highest-scored Oregon projects in the SpecIndex index need electrical, and 71 of those are still in planning or permitting.

Search the full index →

Showing 101–150 of 292 · page 3 of 6

  • Boiler Repair Service and Parts

    Corvallis

    View specs →
  • Design And Construct Frc Homeport Astoria In Astoria, Orunder construction

    · $10M-$50M

  • Fiber Installation

    View specs →
  • Funds Base Schedule Of Construction Project Or Wa Np Multi Pms(1), Pavement Preservation Oregon And Southern Washington.completed

    · $1M-$10M

  • Fy25 West Coast Hopper Dredgingcompleted

    · $10M-$50M

  • Indefinite Delivery/Indefinite Quantity Single Award Task Order Contract For Construction Services At The Roseburg Hcs Iunder construction

    · Under $1M

  • Option Year - Pipeline Dredgingcompleted

    · $10M-$50M

  • Or Dot 140(1), Or 140 - Klamath County Boat Marina To Lakeshore Drivecompleted

    · $10M-$50M

  • Renovations To Bldg.003 To Include Increased Cooling And Heating Capacity. Installation Of Fume Hood Purchased In Fy2024under construction

    · Under $1M

  • Wahkeena Gate and Wall Repairplanning

    Bridal Veil

    View specs →
  • Bonneville Navigation Lock Upstream Stoplogsunder construction

    · $1M-$10M

  • Design-Build Crrd Tree Cooler And Warehouse Task Orderunder construction

    · $1M-$10M

  • Diamond Lake RS Duplex HVAC Replacementsplanning

    Idleyld Park

    View specs →
  • Dog River And Sahalie Falls Trail Bridge Replacementsunder construction

    · Under $1M

  • Igf::Ct::Igf Or Dot Crgnsa 100(1), Historic Columbia River Highway State Trail Or Dot Crgnsa 100(3), Historic Columbia Runder construction

    · $10M-$50M

  • Indefinite Delivery/Indefinite Quantity Single Award Task Order Contract For Construction Services At The Roseburg Hcs Iunder construction

    · Under $1M

  • Notice of Intent to Sole Sourceplanning

    View specs →
  • Or Dot 18(1), Or58: Coast Fork Willamette River To Lower Salt Cr Bridges. The Primary Objective Of The This Project Is Tcompleted

    · $10M-$50M

  • Or Dot Crgnsa 100(4), Historic Columbia River Highway State Trail, Mitchell Point Crossingcompleted

    · $10M-$50M

  • Or Flap Dot Crgnsa 100(8), Multnomah Falls Viaducts Repair: This 2.6-Mile Project Includes Repair Of Two Historic Reinfocompleted

    · $10M-$50M

  • Or Tillamook B780(1), Cape Meares Road Relocationcompleted

    · $10M-$50M

  • Roads And Sewer Constructionunder construction

    · $1M-$10M

  • Roof Replacements (Mt Hood NF)planning

    Dufur

    View specs →
  • Task Order For Fawn Creek Rec Site Cxt Placement To Be Issued Under Fws Matoc For Alt/Repair (Civil) (140F0822D0048). Alunder construction

    · Under $1M

  • Warm Springs Modernization Design-Buildunder construction

    · $10M-$50M

  • West Coast Hopper Maintenance Dredging 2024completed

    · $10M-$50M

  • Western Oregon Service Unit (Wosu) School Based Health Center (Sbhc) Design-Buildunder construction

    · $10M-$50M

  • 692-22-105 Renovate Space In Buildings 217A And 218A For Mental Healthunder construction

    · $1M-$10M

  • Agricultural Research Service (Ars)/National Clonal Germplasm Repository Is Located At The Lewis Brown Research Farm In completed

    · $10M-$50M

  • Attached For Public Posting Is A Copy Of The Bid Abstract And Bid Abstract Continuation Sheet (2 Pgs Total) For Solicitaunder construction

    · $10M-$50M

  • Bldg 210 Alteration And Constructioncompleted

    · $1M-$10M

  • *CANCELLED* USCG ANT Coos Bay Power Pole Repair

    Charleston

    View specs →
  • Con Nrm 653-19-101 Edii Correct Electrical Deficienciesunder construction

    · $10M-$50M

  • Construction Services Consists Of Paving, Chipseal, Patching, Grading, And Bridgrail.completed

    · $1M-$10M

  • Construct Replacement Fish Health Center Lab At Warm Springs Nfhcompleted

    · $1M-$10M

  • Contractor To Provide Design And Construction Services To Complete The Mental Health Project At The Minneapolis Vamccompleted

    · $10M-$50M

  • Coos Bay Upriver Clamshell Maintenance Dredging 2024completed

    · $10M-$50M

  • Erfo Road 19 - Mp 55.5 Bridge (Deathball Bridge)completed

    · Under $1M

  • Funds Construction Contract Or Flap Dot Crgnsa 100(9), Historic Columbia River Highway State Trail, Perham Creek To Mitcunder construction

    · $1M-$10M

  • Funds Construction Project Or Flap Douglas 251(1), Oregon Dunes National Recreation Area - Umpqua Dunes Access Improvemecompleted

    · $1M-$10M

  • Funds Construction Project: Or Fs Dshut601 60(1), Road 60 Improvements, Mp 0 - 1.0. Work Includes Grinding, Paving, Stricompleted

    · Under $1M

  • Lamonta Fire Operations Building, Phase 2under construction

    · $10M-$50M

  • Mcnary Lock Elevator No. 2 Replacementunder construction

    · $1M-$10M

  • National Historic Oregon Trail Interpretive Center: Sustainability Improvements.completed

    · $1M-$10M

  • Oregon Washington Clamshell Maintenance Dredging 2025completed

    · $1M-$10M

  • Or Flap Polk Mitchell(1), Mitchell Street And Black Rock Road Reconstruction. This Project Includes Reconstruction Of Micompleted

    · $1M-$10M

  • Or Klamath Falls Fwo Construction Phaseunder construction

    · $1M-$10M

  • Or-Klamath Falls Nfh Construction Of Phase 1under construction

    · $10M-$50M

  • Parking Lot Paving Station Depoe Bay

    Depoe Bay

    View specs →
  • Perform Design-Bid-Build Construction Task Order As Solicited Under Taskorder Announcement 70Z05024R43000004, Uscg Staticompleted