Oregon · Division 26
Electrical projects in Oregon · page 4
Lighting, switchgear, generators, distribution. Usually specified by the electrical engineer. Counted across our 300 highest-priority scored Oregon projects, 292 need this division and 71 are still in planning or permitting.
As of 2026-11-03, 292 of the 300 highest-scored Oregon projects in the SpecIndex index need electrical, and 71 of those are still in planning or permitting.
Search the full index →Showing 151–200 of 292 · page 4 of 6
- Sp-Pol-Srm-Portland Iap. Or-Containment Fueling System Repairs W9128F21R0011 Rftop 83completed
· $1M-$10M
- The General Contractor Shall Provide All Labor, Materials, Equipment, Qualified Supervision, And Other Items To Completeunder construction
· $1M-$10M
- Umpqua Nf Office Buildingcompleted
· $1M-$10M
- Usfs Sisters Ranger District Administration Building Deschutes National Forest Sisters Ranger District Deschutes County,completed
· $1M-$10M
- Visn 20 Construction Idiq Matoc 653-19-100 Replace Building Hvac Systemcompleted
· $10M-$50M
- Warm Springs Detention Center Rehabilitation Centercompleted
· $1M-$10M
- View specs →Z--MT. ASHLAND (KMAX) NEXRAD ROOF REPLACEMENT
- Cemetery Expansioncompleted
· $1M-$10M
- Con 653-25-104 Install Outdoor Pavilionscompleted
· Under $1M
- Construction Project To Add 6,500 Sq. Ft. And Minor Alterations For Bldg 235. Includes Exercised Option To Demolish Bldgunder construction
· $1M-$10M
- Construction Services For Project Or Dot 18(2), Or58 Fix-It Corridor Culvertscompleted
· $1M-$10M
- Construction Services For Project Or Fs Erfo 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 & Wa Erfounder construction
· $1M-$10M
- Crazy Creek Fire Range Fence Reconstruction And Repair (Suppression Repair Work And Possible Bar)under construction
· $1M-$10M
- Esr Fence Repair & Install_Vale District, Orunder construction
· $1M-$10M
- Funding Construction Project Or Flap Grant 24(2), Granite Hill Road Reconstruction, Phase Ii.completed
· $1M-$10M
- Fy23 Shrine Project For Willamette Natlcompleted
· $1M-$10M
- Gaoa Road 13 Reconstructionunder construction
· $1M-$10M
- View specs →Gold Beach Ranger Station Roof Replacementsplanning
Gold Beach
- Maupin Work Site Renovationcompleted
· $1M-$10M
- Or Lookingglass Fh Intake, Fish Ladder, And Traveling Screenscompleted
· $1M-$10M
- Remodel Building 88 Clc Space, Construction Projectunder construction
· $1M-$10M
- Replace Building 65 Chillers At Roseburg Va Medical Centerunder construction
· $1M-$10M
- The Project Consists Of Procurement, Delivery, And Placement Of Jetty Armor Stone. The Mandatory Work Includes Toe And Scompleted
· $1M-$10M
- (Umpqua National Forest)This Project Consists Installing An Asphalt Concrete Apron At The Transition Between Shoreview Dcompleted
· Under $1M
- View specs →USCG ANT Coos Bay Power Pole Repair
Charleston
- 0614 (Uma) 54 Road Flood Repair Construction Phase 2under construction
· $1M-$10M
- 692-Csi-101 Mri Site Prepcompleted
· $1M-$10M
- Baker Fire Crew Quarters For Blm-Vale District Officecompleted
· $1M-$10M
- View specs →C--Hart Bar Concrete Project
Plush
- Construction Services On Wfl Project Or Flap Dot 126(1), Blue Pool Safety And Access Enhancement Project Includes Pavingcompleted
· $1M-$10M
- Gaoa Big Creek Aop Project Malheur National Forest Prairie City Ranger District Grant County, Orcompleted
· $1M-$10M
- Gaoa - Burns Junction Fire Guard Station Renovation For Blm Vale District Office, Oregoncompleted
· $1M-$10M
- Gaoa - This Project Consists Of All Work And Furnishing The Necessary Materials Relating To The Removal Of Existing Asphcompleted
· $1M-$10M
- Indefinite Delivery/Indefinite Quantity Single Award Task Order Contract For Construction Services At The Roseburg Hcs Icompleted
· Under $1M
- Lakeview Recreational Repairs, Blm-Lakeview District Office, Oregoncompleted
· Under $1M
- Lookingglass Fh - Egg Incubation Roomunder construction
· $1M-$10M
- Mcnary Hood Park Boat Ramp Parking Lot And Road Repavingunder construction
· $1M-$10M
- View specs →Mini Splits with Heat Pump for Cole M. Rivers Hatcheryplanning
Trail
- Or Erfo Fs Umpqu 615-2022-2(1), Umpqua Erfo Repairs 2022. Work Includes Repair Of Aggregate Roadway, Ditch Regrading, Mecompleted
· Under $1M
- Or Flap Crook 123(1), Ochoco Ranger Station Road Overlay Hot Asphalt Concrete, Shoulder Aggregate, Asphalt Milling, Raiscompleted
· $1M-$10M
- Or-Klamath Falls Fwo-Phase 5 Constructionunder construction
· $1M-$10M
- Or Union 101(1) North Powder River Lane Reconstruction. This Work Consists Of: Subgrade Repair, Full Depth Reclamation,completed
· $1M-$10M
- Pendleton, Deferred Maintenance Project A, Project Includes The Partitioning And Insulation Of A Portion Of Building 002under construction
· Under $1M
- Rehabilitate Freight Elevatorcompleted
· $1M-$10M
- Rehabilitate Visitor Facilities At North Junction Viewpoint For Safety And Resource Protection, Crater Lake National Parunder construction
· $1M-$10M
- Repair Subgrade Failures On Nfsr 73 Road Asphalt Subgrade Repairsunder construction
· Under $1M
- The 31 Road Is A Main Paved Road With High Speeds Of Travel. During The Falls Fire, The Asphalt Road Surface Degraded Siunder construction
· Under $1M
- The Work Covered Under This Specification Includes The Installation Of A New Instrument Landing System (Ils) And Fiber Ocompleted
· $1M-$10M
- This Is A Construction Requirement For The Repair Of 3 Sites With Slide Failures Of The Road Embankment And/Or Ground. Pcompleted
· $1M-$10M
- Visn 20 Construction Idiq Matoccompleted
· $1M-$10M