Rhode Island · Division 03
Concrete projects in Rhode Island
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 204 highest-priority scored Rhode Island projects, 116 need this division and 24 are still in planning or permitting.
Search the full index →- View specs →Construct And Renovate New Mri At Providence Vamcunder construction
· $21.4M
- View specs →Noaa Omao Ship & Repair Facilityunder construction
· $149.7M
- View specs →Sluice Gate Actuator Replacement, Hamlet District Pumping Station, Woonsocket Flood Reduction Project, Woonsocket, Riunder construction
· $97,269
- View specs →The Providence (Pvd) Airport Traffic Control Tower (Atct) Has A Project Jcn 1800508 For A Total Roof Replacement Of Atctunder construction
· $1.3M
- View specs →Construction Of A New Electrical Substation.under construction
· $15.3M
- View specs →Replace The Existing Facility Backflow Preventer And Replace With Above Ground Preventer In A Heated Enclosure. Replace completed
· $498,857
- View specs →X001 Db Bulkhead Repairs S366 And Pier 1Navsta Newport, Newport,completed
· $23.4M
- View specs →Dbb Repair Mahan Hall, 3 Chicompleted
· $17.9M
- View specs →Quonset Point Fuel Storage Complex Replacement, Ri Air National Guard, N. Kingstown, Ricompleted
· $14.6M
- View specs →The Work Includes To Design Repair And Modernize The Deep Depth Tank Facility (Ddtf) Rail Trackage Infrastructure At Celunder construction
· $3.7M
- View specs →X003 Bulkhead Repairs, S45N, Naval Station Newport, Ricompleted
· $13.2M
- View specs →Icu Igf::Ot::Igfcompleted
· $8.5M
- View specs →Providence Harwood Center For Research Renovationcompleted
· $11.5M
- View specs →X099 Design-Build Building 1371, Autonomous Underwater Vehicle Adunder construction
· $8.8M
- View specs →Db Nuwc B1320 Joint Workspace Additioncompleted
· $6.3M
- View specs →Nuwc B-1171completed
· $6.3M
- View specs →Narragansett Facility Seawater Pump House Relocationcompleted
· $3.7M
- View specs →B114 Nuwc Process Piping And Chiller Replacementcompleted
· $1.8M
- View specs →Bldg 1112 Replace Chillerunder construction
· $368,819
- View specs →Db B7 Natick Replace Roofcompleted
· $1.7M