Rhode Island · Division 07
Thermal and Moisture Protection projects in Rhode Island
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 204 highest-priority scored Rhode Island projects, 182 need this division and 68 are still in planning or permitting.
Search the full index →- View specs →URI Flagg Road Residence Halls & Graduate Villageunder construction
South Kingstown · $175M
- View specs →Barrington $250M School Construction Projectunder construction
Barrington · $250M
- View specs →Construct And Renovate New Mri At Providence Vamcunder construction
· $21.4M
- View specs →Noaa Omao Ship & Repair Facilityunder construction
· $149.7M
- View specs →Sluice Gate Actuator Replacement, Hamlet District Pumping Station, Woonsocket Flood Reduction Project, Woonsocket, Riunder construction
· $97,269
- View specs →The Providence (Pvd) Airport Traffic Control Tower (Atct) Has A Project Jcn 1800508 For A Total Roof Replacement Of Atctunder construction
· $1.3M
- View specs →Construction Of A New Electrical Substation.under construction
· $15.3M
- View specs →Construction - NUWCDIVNPT - Consolidated Secure Facilitybidding
Newport · Not reported
- View specs →N4008526R0151 Design Build Provide full repairs to Building 1372, Coddington Point (CP), referred to as Ripley Hall. Navunder construction
Newport · Not reported
- View specs →P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT, RHODE ISLANDplanning
Newport · Not reported
- View specs →Replace The Existing Facility Backflow Preventer And Replace With Above Ground Preventer In A Heated Enclosure. Replace completed
· $498,857
- View specs →X001 Db Bulkhead Repairs S366 And Pier 1Navsta Newport, Newport,completed
· $23.4M
- View specs →Dbb Repair Mahan Hall, 3 Chicompleted
· $17.9M
- View specs →DB Repair OTC Dorm King Hall Bldg. 291planning
Newport · Not reported
- View specs →Quonset Point Fuel Storage Complex Replacement, Ri Air National Guard, N. Kingstown, Ricompleted
· $14.6M
- View specs →The Work Includes To Design Repair And Modernize The Deep Depth Tank Facility (Ddtf) Rail Trackage Infrastructure At Celunder construction
· $3.7M
- View specs →X003 Bulkhead Repairs, S45N, Naval Station Newport, Ricompleted
· $13.2M
- View specs →Construction - NUWCDIVNPT - Consolidated Secure Facilitybidding
Newport · Not reported
- View specs →Icu Igf::Ot::Igfcompleted
· $8.5M
- View specs →N4008526R0221, Design Bid Build - Steam and Condensate Repairs Vicinity of B690CP and B1163CP, Naval Station Newport, Nebidding
Newport · Not reported