US · Division 07

Thermal and Moisture Protection projects in US · page 5

Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored US projects, 291 need this division and 3 are still in planning or permitting.

As of 2026-11-03, 291 of the 300 highest-scored US projects in the SpecIndex index need thermal and moisture protection, and 3 of those are still in planning or permitting.

Search the full index →

Showing 201–250 of 291 · page 5 of 6

  • (Ortc) Operational Readiness Training Complex - Phase 1.3A, East Camp Grafenwoehrunder construction

    · $1M-$10M

  • P130 Communications Station, Naval Air Station Sigonella, Italyunder construction

    · $50M-$100M

  • P2303 Whole House Revitalization, Ikego Townhouse, Ph 5under construction

    · $50M-$100M

  • P313 Mh-60R Base Improvements, Naval Station Rota, Spaincompleted

    · $50M-$100M

  • P622 Edi: Eod Mobile Facility, Rota, Spain Construction Task Orderunder construction

    · $50M-$100M

  • P695 Joint Mobility Centerunder construction

    · $50M-$100M

  • P-759 Family Housing Villaggio Sw & Camp Ederle North, Vicenza Italycompleted

    · $50M-$100M

  • Pn77881 Fy21 Army Family Housing Construction, Kwajalein, Republic Of The Marshall Islandscompleted

    · $50M-$100M

  • Project: Isb-25-0370- Db Traffic And Roadway Improvements Commissary/School Intersection Hainerberg, Wiesbaden, Germany.under construction

    · $1M-$10M

  • Replace Transformer Station H1157, Hohenfels, Germanyunder construction

    · $1M-$10M

  • Sofa Abg-X Pn093791 Ortc Ph 1.1B Grafenwoehrunder construction

    · $50M-$100M

  • Sofa Abg-X Replace Es Spangdahlemunder construction

    · $50M-$100M

  • Sofa Abg-X Simulation Center Hohenfelsunder construction

    · $50M-$100M

  • Sofa Abg-X Ueph & Pkg Garage Barton Barracks Ansbachunder construction

    · $50M-$100M

  • Sofa Abg-X Unaccompanied Enlisted Personnel Housing (Ueph) Ansbachunder construction

    · $50M-$100M

  • Sofa: Site 13853-417 Construction, Israelcompleted

    · $50M-$100M

  • Somalia Danab Camps Constructionunder construction

    · $50M-$100M

  • Super Hornet Procurement B, Kuwait. Construction Of A New Organizational Level Maintenance Hangar With Eight Aircraft Bacompleted

    · $50M-$100M

  • The Contractor Shall Provide All Design Plans, Labor, Materials, Tools, Equipment, Supervision And Transportation Necesscompleted

    · $1M-$10M

  • The Contractor Shall Provide All Engineering, Labor, Parts, Equipment, Tools, And Supplies To Build An Asphalt Road Starcompleted

    · Under $1M

  • The Contractor Shall Provide Services In Support Of The Lisbon Csu Projectunder construction

    · Under $1M

  • This Is A Construction Contract Whose Purpose Is To Provide Upgrades To Three Existing Facilities In Keflavik, Iceland.under construction

    · $10M-$50M

  • Ukraine Task Order For Design, Integration, Construction, Communication And Engineering 2, Contract Line Item Number 1, completed

    · $50M-$100M

  • Usa Pavilion Design, Construction, Exhibition, And Decommissioning For Expo 2025 Osaka, Japancompleted

    · $50M-$100M

  • 7.1.2-7.1.3 Servicesunder construction

    · $10M-$50M

  • Aircraft Mx Hangar Scabcompleted

    · $10M-$50M

  • Alterations And Additions To Existing Buildings Project, U.S. Embassy Wellington, New Zealandcompleted

    · $1M-$10M

  • Award Contract For Facade Repair Services To Complete Design, Construction Services, Contract Coordination And Supervisiunder construction

    · $10M-$50M

  • Award For Compound Security Upgrade Located In Dhaka, Bangladesh.Igf::Ot::Igfcompleted

    · $10M-$50M

  • Base Bid Items Construction Of Fy 14. Line Item 0001, 0002 And 0003 Are Awarded.completed

    · $10M-$50M

  • Base Price - P903 Joint Mobility Centerunder construction

    · $10M-$50M

  • Baufee 7.1.2-7.1.3 Ddcx2002 Dla Logisticompleted

    · $10M-$50M

  • Blatchford-Preston Complex Phase 3 - Billetscompleted

    · $10M-$50M

  • Build 4 Tomorrow - Jenin Wastewater Management System And Reuse Projectcompleted

    · $10M-$50M

  • Compound Upgrade Window Replacement Program In Cairo, Egyptunder construction

    · $10M-$50M

  • Construct Acp Structure, Gate 27, Darby Military Community, Italyunder construction

    · Under $1M

  • Construct Bulk Pol Storage Tank & Facilities.under construction

    · $10M-$50M

  • Construct Dammam Helicopter Hangar, Warehouse, And Gse Facilityunder construction

    · $10M-$50M

  • Construct F-16 Maintenance Hangar, Marsa Matrouh Air Base, Egyptcompleted

    · $10M-$50M

  • Construct Grafenwoehr Elementary, Germanyunder construction

    · $10M-$50M

  • Construction Of 5 Multi-Functional Tank Warehousescompleted

    · $10M-$50M

  • Construction Of Airfield Damage Repair Equipment Storage Facility, Yokota Air Base, Japanunder construction

    · $10M-$50M

  • Construction Of Community Day Secondary Schools Community Day Secondary Schools (Cdsss) In 12 Districts Across Malawi Idcompleted

    · $10M-$50M

  • Construction Of Facility A-Maintenancecompleted

    · $10M-$50M

  • Construction Services For The Nicosia, Cyprus Compound Security Upgrade Project.under construction

    · $10M-$50M

  • Construct Shore To Ship Utilities, At Naval Support Activity (Nsa) Waterfront, Located At Manama Bahraincompleted

    · $10M-$50M

  • Construct Transient Quarters&Dining Facility, Manama, Bahraincompleted

    · $10M-$50M

  • Contract N62742-24-C-1304, Fy24 Ayhn239001 (P-9001), Pdi Transient Aircraft Parking Apron, Basa Air Base, Philippinescompleted

    · $10M-$50M

  • Delivery And Installation Of Accomodation Containers In Guayaquil, Ecuadorunder construction

    · Under $1M

  • Design-Bid-Build Construction Contract To Built P-118 Vicenza High School Replacement, Vicenza, Italycompleted

    · $10M-$50M