US · Division 07
Thermal and Moisture Protection projects in US · page 6
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored US projects, 291 need this division and 3 are still in planning or permitting.
As of 2026-11-03, 291 of the 300 highest-scored US projects in the SpecIndex index need thermal and moisture protection, and 3 of those are still in planning or permitting.
Search the full index →Showing 251–291 of 291 · page 6 of 6
- Design / Build Floating Dockunder construction
· Under $1M
- Design/Build Of The Nouakchott Cmr Expansioncompleted
· $10M-$50M
- Design Build Services For The Us Embassy In San Salvador Csu.completed
· $10M-$50M
- Design/Construction, Military Police And Signal Schoolcompleted
· $10M-$50M
- Design, Integration, Communications, Construction And Engineering (Dicce) Services In Azerbaijan - Group 4 Sites, Instalcompleted
· $10M-$50M
- Dicce - Bulgaria Group 1 Incremental For Na-25completed
· $10M-$50M
- Edi Aircraft Parking Apron At Campia Turzii Air Base, Romaniacompleted
· $10M-$50M
- Funding For Construction Security Guards At International Embassies.completed
· $10M-$50M
- Fy18 Mca, Pn 81359, Unmanned Aerial Vehicle Hangar, Usag Humphreys, Koreaunder construction
· $10M-$50M
- Fy19 Dla Desc1911 Construct Truck Offload Facilities, Kadena Air Base, Okinawa, Japancompleted
· $10M-$50M
- Fy2202 Znre254300 Improve Family Housing, Yokota Air Base, Phase 8 (45 Un) - Paip8completed
· $10M-$50M
- Fy22 Znre063004 Combat Arms Training Maintenance (Catm) Facility, Yokota Air Base, Japancompleted
· $10M-$50M
- Fy 25 Fundingunder construction
· $10M-$50M
- Hangar 6010 Install Aircraft Exhaustunder construction
· $1M-$10M
- Igf::Ot::Igf Fpaf Replace Fuel Pier/Tuckload Facilitycompleted
· $10M-$50M
- Igf::Ot::Igf Kazakhstan Task Order For Design, Integration, Construction, Communication And Engineering 2, Contract Linecompleted
· $10M-$50M
- Igf::Ot::Igf Mission Training Complex Grafenwoehr Germany Igf::Ot::Igf Sofaunder construction
· $10M-$50M
- Igf::Ot::Igf Sofa Fh Construction , Vilseck, Germanyunder construction
· $10M-$50M
- Igf::Ot::Igf Task Order For Design, Integration, Construction, Communication And Engineering 2, Contract Line Item Numbecompleted
· $10M-$50M
- Igf::Ot::Igf Task Order For Design, Integration, Construction, Communication And Engineering 2 (Dicce2) Services In Cauccompleted
· $10M-$50M
- Igf::Ot::Igf Task Order For Design, Integration, Construction, Communication And Engineering 2 (Dicce2) Services In Tajicompleted
· $10M-$50M
- Igf::Ot::Igf Task Order Lebanon, Design, Integration, Construction, Communication And Engineering 2.completed
· $10M-$50M
- Igf::Ot::Igf Uzbekistan Task Order For Design, Integration, Construction, Communication And Engineering 2, Contract Linecompleted
· $10M-$50M
- Incremental Funding Is Being Obligated To Award The Construction Security Task Order Providing Up To 1 Team Leader, 4 Csunder construction
· $1M-$10M
- Kuwait Artillery Sites Security Upgradescompleted
· $10M-$50M
- Marine Construction And Repair Kuwait Navy Basecompleted
· $10M-$50M
- Megaports Services In Malaysia For Na-25completed
· $10M-$50M
- Military Construction Project 014 Rapid Airfield Damage Repair Storage Facility, Moron Air Base Task Ordercompleted
· $10M-$50M
- Military Construction Project P002 European Deterrence Initiative: Rapid Airfield Damage Recovery Storage Facilities, Avcompleted
· $10M-$50M
- Military Construction Project P-620 Edi: Expeditionary Maintenance Facility Rota, Spaincompleted
· $10M-$50M
- Munitions Storage Area (Msa) And Infrastructure Within An Undisclosed Location In The Hashemite Kingdom Of Jordan.completed
· $10M-$50M
- N40084-20-D-0072/N4008422F4724 - Family Housing Midrise #7 Whole-House Revitalization (Whr), Mcas Iwakuni, Japan (Id#486under construction
· $10M-$50M
- Namru-6 Building 1 Revitalization - Task Ordercompleted
· $10M-$50M
- New Army Family Housing (3-Bedroom) Conscompleted
· $10M-$50M
- New Embassy Design Build Renovation At Us Embassy Bern Switzerland.under construction
· $10M-$50M
- On Site Construction Manager.under construction
· Under $1M
- P131 - Communications Center Naval Support Activity Souda Bay, Greececompleted
· $10M-$50M
- P655 Fleet Maintenance Facility, Sigonella, Italycompleted
· $10M-$50M
- Parking Apron And Aircraft Parking Shelters. The Aircraft Parking Shelters That Are Designed As Two Hangar Buildings Witunder construction
· $10M-$50M
- Power Generation Servicescompleted
· $10M-$50M
- Project Es-00241-4P Replace Circuit Breaker B-5078under construction
· Under $1M