Utah · Division 03

Concrete projects in Utah

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Utah projects, 88 need this division and 6 are still in planning or permitting.

As of 2026-11-03, 88 of the 300 highest-scored Utah projects in the SpecIndex index need concrete, and 6 of those are still in planning or permitting.

Search the full index →

Showing 1–50 of 88 · page 1 of 2

  • Gaoa Red Canyon Corridor Paving And Campground Restoration Project, Ashley National Forestunder construction

    · $1M-$10M

  • Comprehensive 309Th Paving Project Includes Repair/Replace/Construct Pavements And Appurtenances Around Bldgs 238, 265, planning

    · $1M-$10M

  • Improve Road And Campgrounds For Timber Saleunder construction

    · $1M-$10M

  • Notice of Intent to Sole Source Award: Ground Based Strategic Deterrent (GBSD) Mission Integration Facility (MIF) - Hillplanning

    UT-01 · $100M+

    View specs →
  • 0402 Const Mores Creek Bridge (329-0.1) Replacementunder construction

    · Under $1M

  • 0410 Skyline Drive Road & Campground Road Improvements R4 Matoc Task Order Project Consists Of Road Reconditioning To Skunder construction

    · $1M-$10M

  • Design And Construct A One-Story Egress Facility (Approx. 12,000 Sf) For Depot-Level Repairs For The New T-7A Advanced Punder construction

    · $10M-$50M

  • Dpg Maintenance And Repair Paving Idiq Contractunder construction

    · $1M-$10M

  • The Project Is For The Delivery Or Haul And Placement Of Aggregate That Meets Spec F From Table 703.05 To Forest Servicecompleted

    · Under $1M

  • Requirement: The Contractor Must Complete A Telecommunication Tower Replacement Project Including Demolition Of Existingunder construction

    · Under $1M

  • 0402 Const Grandjean Road (Nfsr 524) Improvementsunder construction

    · Under $1M

  • Eo 14398- Replace Roofing On Housescompleted

    · Under $1M

  • Meeks Mesa Campground Construction. New Construction State Grant Fundingunder construction

    · $1M-$10M

  • Gaoa - Greys River Corridor Phase 3 - Haul And Place Aggregate Along Roadway For Fs Road Crews To Spread And Construct Tcompleted

    · Under $1M

  • New Kennel Buildingunder construction

    · $1M-$10M

  • Cmc Construction Services For The Frank E. Moss Seismic Upgrade, Backfill, And Renovation Project Located In Salt Lake Ccompleted

    · $100M+

  • D-B Gbsd Mission Integration Facility. Note: This Requirement Is Incrementally Funded For Clin 0001. Once Fully Funded Ccompleted

    · $100M+

  • F-35 T-7A East Campus Infrastructure, Hill Afb Dbb Satoc Idiq Task Order #1 - American Water Utilityunder construction

    · $50M-$100M

  • Ground Based Strategic Defense (Gbsd) Software Sustainment Center (Ssc), Hill Afbcompleted

    · $100M+

  • To# 13 - Incidental Contaminated Soiles (Testing, Containment, And Disposal) @ Hafb, Utunder construction

    · Under $1M

  • 1289 Parking Lot. To Under Hafb Paving Idiq Contract, Fa820123D0005. Contractor Shall Furnish All Materials, Labor, Toolunder construction

    · Under $1M

  • Base Pavement Markings. To Under Hafb Paving Idiq Contract, Fa820123D0007. Contractor Shall Furnish All Materials, Laborunder construction

    · Under $1M

  • Construction Of A 7,292 Square Meter Ground Base Strategic Defense Technology And Collaboration Center To Provide A Mix completed

    · $50M-$100M

  • F-35 T-7A East Campus Infrastructure, Hill Afb Dbb Task Order 02 City Light And Powerunder construction

    · $10M-$50M

  • Ut Flap Web 10(1) Causey Reservoir Access Contract For 3R And 4R Road Construction Improvements To Causey Reservoirunder construction

    · $10M-$50M

  • Consolidated Mission Control Centerunder construction

    · $10M-$50M

  • Construction Of A Composite Aircraft Antenna Calibration Facility (Caacf) At Hill Air Force Base (Hafb), Utah. Constructcompleted

    · $10M-$50M

  • Hafb B748 Asphalt R And R. To Under Hafb Paving Idiq Contract, Fa820123D0005. Contractor Shall Furnish All Materials, Launder construction

    · Under $1M

  • Hafb Fy26 Airfield Maintenance. To Under Hafb Paving Idiq Contract, Fa820123D0007. Contractor Shall Furnish All Materialunder construction

    · Under $1M

  • Navy Operations Support Centercompleted

    · $10M-$50M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Necunder construction

    · $10M-$50M

  • Utah Test And Training Range Design-Bid-Build Construction Of Nine (9) Munitions Storage Magazines.completed

    · $10M-$50M

  • Aftc Molf Constructioncompleted

    · $10M-$50M

  • Emergency Department And Support Expansioncompleted

    · $10M-$50M

  • Eo 14398 Canyonlands National Park, Isky District, Grand View Point Vault Toiletsunder construction

    · Under $1M

  • Gaoa-Henry Mountains Field Station, Utunder construction

    · $1M-$10M

  • Ut Flap Sla 10(1) Mill Creek Canyon Road Construction Contractunder construction

    · $10M-$50M

  • Zion 317454/240254/319664/352304 - Rehabilitate South Campground With Capital Improvements And Construct Wilderness Permcompleted

    · $10M-$50M

  • Cedar City Rural Initiativecompleted

    · $10M-$50M

  • Design And Construct Microgrid At Dugway Proving Grounds, Utahcompleted

    · $1M-$10M

  • Design Build Construction To Construct Modular Storage Magazines And Aprons At Hill Air Force Base.completed

    · $10M-$50M

  • Design & Construct Tooele 2Mw Solar Pvcompleted

    · $1M-$10M

  • Missile Storage Facilitycompleted

    · $1M-$10M

  • Reconstruction Of Pine Valley Dam, Dixie National Forest, Utah (Gaoa)under construction

    · $1M-$10M

  • Repair Fuel Tanks At Gowen Field Ang, Id & Hill Afb, Utunder construction

    · $10M-$50M

  • This Contract Will Be New And Is To Procure A Contractor To Replace Leaking Roof, Repaint The Atct Building, Remove Old completed

    · Under $1M

  • This Task Order Awards Base Bid Items + Option A & Option Item C As Mentioned In The Schedule Of Items (Soi).under construction

    · $1M-$10M

  • Tooele Air Center - Design Buildcompleted

    · $1M-$10M

  • Tooele Gas Line And Fuel Swapcompleted

    · $10M-$50M

  • Ut-Bear Riv Mgrtry Bird-Rehab Wcsunder construction

    · $1M-$10M