Utah · Division 03
Concrete projects in Utah · page 2
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Utah projects, 89 need this division and 6 are still in planning or permitting.
As of 2026-11-03, 89 of the 300 highest-scored Utah projects in the SpecIndex index need concrete, and 6 of those are still in planning or permitting.
Search the full index →Showing 51–89 of 89 · page 2 of 2
- Ut-Bear Riv Mgrtry Bird-Rehab Wcsunder construction
· $1M-$10M
- Ut Erfo Uinta Nf 70014(2) Santaquin Canyon Road Erfo Spot Repairs Schedule A Option Xcompleted
· $1M-$10M
- Ut Ftbl 7133(1) Canyon Rims Roadcompleted
· $1M-$10M
- Ut Np Care 10(2) & 100(1) Scenic Drive & Goosenecks Road Road Construction And Rehabilitation Contractcompleted
· $10M-$50M
- Dla Lot 4 Open Storagecompleted
· $1M-$10M
- Gbsd Ssc-Igloos Constructioncompleted
· $1M-$10M
- Ir Site Prep (660-Csi-111)completed
· $1M-$10M
- Provo River Delta Fishing Platformscompleted
· Under $1M
- Station Service Switchgear, Relays, Switchboards, Power Generators, Etc. For The Flaming Gorge And Fontenelle Power Plancompleted
· $1M-$10M
- The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted
· $1M-$10M
- U&O Pavement (Project Ph23Uo01C6)under construction
· $1M-$10M
- Bear River Wildlife Fence And Riparian Exclosure Replacementcompleted
· $1M-$10M
- Cldq Quarry Building Replacementunder construction
· $1M-$10M
- Design And Build Bunkhouse At Bear River Migratory Bird Refugeunder construction
· $1M-$10M
- Dpg Maintenance And Repair Paving Idiq Contract-Section 08 And 09completed
· $1M-$10M
- Dugway Generator Replacementunder construction
· Under $1M
- F-35 T-7A East Campus Infrastructure, Hill Afb Dbb To# 8 - Fire Suppression Water Infrastructurecompleted
· $1M-$10M
- F-35 T-7A East Campus Infrastructure, Hill Afb To#7 Natural Gas Distribution Piping Systemcompleted
· $1M-$10M
- Gaoa-Cedar City Air Base Improvements Design-Buildunder construction
· $1M-$10M
- Gaoa - Rfo Fire Engine Storage Structure Replacement, Utcompleted
· Under $1M
- Holladay Signal Optimization Enhancementsdeadline not recorded
- I-15; SB Passing Lane MP 15.0 to 20.3deadline not recorded
- Install A Vapor Intrusion Remediation System And Supporting Repairs To A Private Resident In Salt Lake City, Utah.completed
· Under $1M
- Provo Area Office Cubicle Remodel Task Ordercompleted
· $1M-$10M
- Renovate/Repair Bldg. 849 Room D10 To Improve The Computer Room Air Conditioner (Crac) Cooling Efficiency.completed
· $1M-$10M
- SR-198; Spanish Fork Main to US-6deadline not recorded
- Tams Hma Parking Lot. To Under Hafb Paving Idiq Contract, Fa820123D0005. Contractor Shall Furnish All Materials, Labor, under construction
· Under $1M
- US-89; State St & 1870 N Intersection, Lehideadline not recorded
Lehi
- Ut Np Brca Path (3) Bryce Canyon Shared Use Path Multi-Use Path Construction And Drainagecompleted
· $1M-$10M
- Water Suply And Hydrant Loopcompleted
· $1M-$10M
- White Sands Campground Redevelopmentcompleted
· $1M-$10M
- Zion 240182 Construction Bus Charging Ev Phase 3completed
· $1M-$10M
- Bear River Fence & Enclosure Replacement Phase 2under construction
· $1M-$10M
- Construct F-35 Age Yard Cover, B5060completed
· $1M-$10M
- Dorm Campus Lot At Hill Afb. All Work Shall Be Performed In Accordance With The Most Current Statement Of Work Attached completed
· Under $1M
- Dpg Maintenance And Repair Paving Idiq Contractcompleted
· Under $1M
- Dpg Maintenance And Repair Paving Idiq Contractcompleted
· Under $1M
- F-35 T-7A East Campus Infrastructure, Hill Afb To# 10 - Itn Node Comm Building @ Hafb, Utcompleted
· Under $1M
- Gaoa - Coal Creek Warehousecompleted
· Under $1M