Utah · Division 03

Concrete projects in Utah · page 2

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Utah projects, 89 need this division and 6 are still in planning or permitting.

As of 2026-11-03, 89 of the 300 highest-scored Utah projects in the SpecIndex index need concrete, and 6 of those are still in planning or permitting.

Search the full index →

Showing 51–89 of 89 · page 2 of 2

  • Ut-Bear Riv Mgrtry Bird-Rehab Wcsunder construction

    · $1M-$10M

  • Ut Erfo Uinta Nf 70014(2) Santaquin Canyon Road Erfo Spot Repairs Schedule A Option Xcompleted

    · $1M-$10M

  • Ut Ftbl 7133(1) Canyon Rims Roadcompleted

    · $1M-$10M

  • Ut Np Care 10(2) & 100(1) Scenic Drive & Goosenecks Road Road Construction And Rehabilitation Contractcompleted

    · $10M-$50M

  • Dla Lot 4 Open Storagecompleted

    · $1M-$10M

  • Gbsd Ssc-Igloos Constructioncompleted

    · $1M-$10M

  • Ir Site Prep (660-Csi-111)completed

    · $1M-$10M

  • Provo River Delta Fishing Platformscompleted

    · Under $1M

  • Station Service Switchgear, Relays, Switchboards, Power Generators, Etc. For The Flaming Gorge And Fontenelle Power Plancompleted

    · $1M-$10M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted

    · $1M-$10M

  • U&O Pavement (Project Ph23Uo01C6)under construction

    · $1M-$10M

  • Bear River Wildlife Fence And Riparian Exclosure Replacementcompleted

    · $1M-$10M

  • Cldq Quarry Building Replacementunder construction

    · $1M-$10M

  • Design And Build Bunkhouse At Bear River Migratory Bird Refugeunder construction

    · $1M-$10M

  • Dpg Maintenance And Repair Paving Idiq Contract-Section 08 And 09completed

    · $1M-$10M

  • Dugway Generator Replacementunder construction

    · Under $1M

  • F-35 T-7A East Campus Infrastructure, Hill Afb Dbb To# 8 - Fire Suppression Water Infrastructurecompleted

    · $1M-$10M

  • F-35 T-7A East Campus Infrastructure, Hill Afb To#7 Natural Gas Distribution Piping Systemcompleted

    · $1M-$10M

  • Gaoa-Cedar City Air Base Improvements Design-Buildunder construction

    · $1M-$10M

  • Gaoa - Rfo Fire Engine Storage Structure Replacement, Utcompleted

    · Under $1M

  • Holladay Signal Optimization Enhancementsdeadline not recorded

  • I-15; SB Passing Lane MP 15.0 to 20.3deadline not recorded

  • Install A Vapor Intrusion Remediation System And Supporting Repairs To A Private Resident In Salt Lake City, Utah.completed

    · Under $1M

  • Provo Area Office Cubicle Remodel Task Ordercompleted

    · $1M-$10M

  • Renovate/Repair Bldg. 849 Room D10 To Improve The Computer Room Air Conditioner (Crac) Cooling Efficiency.completed

    · $1M-$10M

  • SR-198; Spanish Fork Main to US-6deadline not recorded

  • Tams Hma Parking Lot. To Under Hafb Paving Idiq Contract, Fa820123D0005. Contractor Shall Furnish All Materials, Labor, under construction

    · Under $1M

  • US-89; State St & 1870 N Intersection, Lehideadline not recorded

    Lehi

  • Ut Np Brca Path (3) Bryce Canyon Shared Use Path Multi-Use Path Construction And Drainagecompleted

    · $1M-$10M

  • Water Suply And Hydrant Loopcompleted

    · $1M-$10M

  • White Sands Campground Redevelopmentcompleted

    · $1M-$10M

  • Zion 240182 Construction Bus Charging Ev Phase 3completed

    · $1M-$10M

  • Bear River Fence & Enclosure Replacement Phase 2under construction

    · $1M-$10M

  • Construct F-35 Age Yard Cover, B5060completed

    · $1M-$10M

  • Dorm Campus Lot At Hill Afb. All Work Shall Be Performed In Accordance With The Most Current Statement Of Work Attached completed

    · Under $1M

  • Dpg Maintenance And Repair Paving Idiq Contractcompleted

    · Under $1M

  • Dpg Maintenance And Repair Paving Idiq Contractcompleted

    · Under $1M

  • F-35 T-7A East Campus Infrastructure, Hill Afb To# 10 - Itn Node Comm Building @ Hafb, Utcompleted

    · Under $1M

  • Gaoa - Coal Creek Warehousecompleted

    · Under $1M