Utah · Division 07

Thermal and Moisture Protection projects in Utah · page 3

Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Utah projects, 156 need this division and 60 are still in planning or permitting.

As of 2026-11-03, 156 of the 300 highest-scored Utah projects in the SpecIndex index need thermal and moisture protection, and 60 of those are still in planning or permitting.

Search the full index →

Showing 101–150 of 156 · page 3 of 4

  • CDC ARSR HVAC Replacement

    Brian Head

    View specs →
  • Cedar City Rural Initiativecompleted

    · $10M-$50M

  • Design And Construct Microgrid At Dugway Proving Grounds, Utahcompleted

    · $1M-$10M

  • Design Build Construction To Construct Modular Storage Magazines And Aprons At Hill Air Force Base.completed

    · $10M-$50M

  • Design & Construct Tooele 2Mw Solar Pvcompleted

    · $1M-$10M

  • Elevator Modernization, Salt Lake City Airport Air Traffic Control Tower (SLC ATCT) Salt Lake City, UT,planning

    Salt Lake City

    View specs →
  • Eo 14398 Canyonlands National Park, Isky District, Grand View Point Vault Toiletsunder construction

    · Under $1M

  • Missile Storage Facilitycompleted

    · $1M-$10M

  • Reconstruction Of Pine Valley Dam, Dixie National Forest, Utah (Gaoa)under construction

    · $1M-$10M

  • Repair Fuel Tanks At Gowen Field Ang, Id & Hill Afb, Utunder construction

    · $10M-$50M

  • SLC ARSR HVAC Replacement

    Morgan

    View specs →
  • This Contract Will Be New And Is To Procure A Contractor To Replace Leaking Roof, Repaint The Atct Building, Remove Old completed

    · Under $1M

  • This Task Order Awards Base Bid Items + Option A & Option Item C As Mentioned In The Schedule Of Items (Soi).under construction

    · $1M-$10M

  • Tooele Air Center - Design Buildcompleted

    · $1M-$10M

  • Tooele Gas Line And Fuel Swapcompleted

    · $10M-$50M

  • USEB262315 - B302 ISRG Ops HVAC Increase

    View specs →
  • Ut-Bear Riv Mgrtry Bird-Rehab Wcsunder construction

    · $1M-$10M

  • Ut Erfo Uinta Nf 70014(2) Santaquin Canyon Road Erfo Spot Repairs Schedule A Option Xcompleted

    · $1M-$10M

  • Ut Ftbl 7133(1) Canyon Rims Roadcompleted

    · $1M-$10M

  • Ut Np Care 10(2) & 100(1) Scenic Drive & Goosenecks Road Road Construction And Rehabilitation Contractcompleted

    · $10M-$50M

  • DEFENSE LOGISTICS AGENCY (DLA) LOT 4 OPEN STORAGEunder construction

    Hill AFB · $1M-$10M

  • Dla Lot 4 Open Storagecompleted

    · $1M-$10M

  • Gbsd Ssc-Igloos Constructioncompleted

    · $1M-$10M

  • HVAC Equipment Replacement, Millville, Utah

    Millville

    View specs →
  • Ir Site Prep (660-Csi-111)completed

    · $1M-$10M

  • Provo River Delta Fishing Platformscompleted

    · Under $1M

  • Station Service Switchgear, Relays, Switchboards, Power Generators, Etc. For The Flaming Gorge And Fontenelle Power Plancompleted

    · $1M-$10M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted

    · $1M-$10M

  • U&O Pavement (Project Ph23Uo01C6)under construction

    · $1M-$10M

  • USACE SPK Design-Bid-Build Construction -GBSD Software Sustainment Center(SSC) Module Storage Magazines (MSMs)-Hill AFB,under construction

    Hill AFB · $1M-$10M

  • Bear River Wildlife Fence And Riparian Exclosure Replacementcompleted

    · $1M-$10M

  • BLDG 1515 STEAM BOILER REPLACEMENT Industry Dayplanning

    Hill AFB

    View specs →
  • Cldq Quarry Building Replacementunder construction

    · $1M-$10M

  • Design And Build Bunkhouse At Bear River Migratory Bird Refugeunder construction

    · $1M-$10M

  • Dpg Maintenance And Repair Paving Idiq Contract-Section 08 And 09completed

    · $1M-$10M

  • Dugway Generator Replacementunder construction

    · Under $1M

  • F-35 T-7A East Campus Infrastructure, Hill Afb Dbb To# 8 - Fire Suppression Water Infrastructurecompleted

    · $1M-$10M

  • F-35 T-7A East Campus Infrastructure, Hill Afb To#7 Natural Gas Distribution Piping Systemcompleted

    · $1M-$10M

  • Gaoa-Cedar City Air Base Improvements Design-Buildunder construction

    · $1M-$10M

  • Gaoa - Rfo Fire Engine Storage Structure Replacement, Utcompleted

    · Under $1M

  • I-15; SB Passing Lane MP 15.0 to 20.3deadline not recorded

  • Install A Vapor Intrusion Remediation System And Supporting Repairs To A Private Resident In Salt Lake City, Utah.completed

    · Under $1M

  • Provo Area Office Cubicle Remodel Task Ordercompleted

    · $1M-$10M

  • Renovate/Repair Bldg. 849 Room D10 To Improve The Computer Room Air Conditioner (Crac) Cooling Efficiency.completed

    · $1M-$10M

  • Tams Hma Parking Lot. To Under Hafb Paving Idiq Contract, Fa820123D0005. Contractor Shall Furnish All Materials, Labor, under construction

    · Under $1M

  • Ut Np Brca Path (3) Bryce Canyon Shared Use Path Multi-Use Path Construction And Drainagecompleted

    · $1M-$10M

  • Water Suply And Hydrant Loopcompleted

    · $1M-$10M

  • White Sands Campground Redevelopmentcompleted

    · $1M-$10M

  • Zion 240182 Construction Bus Charging Ev Phase 3completed

    · $1M-$10M

  • Bear River Fence & Enclosure Replacement Phase 2under construction

    · $1M-$10M