Utah · Division 07
Thermal and Moisture Protection projects in Utah · page 3
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Utah projects, 156 need this division and 60 are still in planning or permitting.
As of 2026-11-03, 156 of the 300 highest-scored Utah projects in the SpecIndex index need thermal and moisture protection, and 60 of those are still in planning or permitting.
Search the full index →Showing 101–150 of 156 · page 3 of 4
- View specs →CDC ARSR HVAC Replacement
Brian Head
- Cedar City Rural Initiativecompleted
· $10M-$50M
- Design And Construct Microgrid At Dugway Proving Grounds, Utahcompleted
· $1M-$10M
- Design Build Construction To Construct Modular Storage Magazines And Aprons At Hill Air Force Base.completed
· $10M-$50M
- Design & Construct Tooele 2Mw Solar Pvcompleted
· $1M-$10M
- View specs →Elevator Modernization, Salt Lake City Airport Air Traffic Control Tower (SLC ATCT) Salt Lake City, UT,planning
Salt Lake City
- Eo 14398 Canyonlands National Park, Isky District, Grand View Point Vault Toiletsunder construction
· Under $1M
- Missile Storage Facilitycompleted
· $1M-$10M
- Reconstruction Of Pine Valley Dam, Dixie National Forest, Utah (Gaoa)under construction
· $1M-$10M
- Repair Fuel Tanks At Gowen Field Ang, Id & Hill Afb, Utunder construction
· $10M-$50M
- View specs →SLC ARSR HVAC Replacement
Morgan
- This Contract Will Be New And Is To Procure A Contractor To Replace Leaking Roof, Repaint The Atct Building, Remove Old completed
· Under $1M
- This Task Order Awards Base Bid Items + Option A & Option Item C As Mentioned In The Schedule Of Items (Soi).under construction
· $1M-$10M
- Tooele Air Center - Design Buildcompleted
· $1M-$10M
- Tooele Gas Line And Fuel Swapcompleted
· $10M-$50M
- View specs →USEB262315 - B302 ISRG Ops HVAC Increase
- Ut-Bear Riv Mgrtry Bird-Rehab Wcsunder construction
· $1M-$10M
- Ut Erfo Uinta Nf 70014(2) Santaquin Canyon Road Erfo Spot Repairs Schedule A Option Xcompleted
· $1M-$10M
- Ut Ftbl 7133(1) Canyon Rims Roadcompleted
· $1M-$10M
- Ut Np Care 10(2) & 100(1) Scenic Drive & Goosenecks Road Road Construction And Rehabilitation Contractcompleted
· $10M-$50M
- DEFENSE LOGISTICS AGENCY (DLA) LOT 4 OPEN STORAGEunder construction
Hill AFB · $1M-$10M
- Dla Lot 4 Open Storagecompleted
· $1M-$10M
- Gbsd Ssc-Igloos Constructioncompleted
· $1M-$10M
- View specs →HVAC Equipment Replacement, Millville, Utah
Millville
- Ir Site Prep (660-Csi-111)completed
· $1M-$10M
- Provo River Delta Fishing Platformscompleted
· Under $1M
- Station Service Switchgear, Relays, Switchboards, Power Generators, Etc. For The Flaming Gorge And Fontenelle Power Plancompleted
· $1M-$10M
- The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted
· $1M-$10M
- U&O Pavement (Project Ph23Uo01C6)under construction
· $1M-$10M
- USACE SPK Design-Bid-Build Construction -GBSD Software Sustainment Center(SSC) Module Storage Magazines (MSMs)-Hill AFB,under construction
Hill AFB · $1M-$10M
- Bear River Wildlife Fence And Riparian Exclosure Replacementcompleted
· $1M-$10M
- View specs →BLDG 1515 STEAM BOILER REPLACEMENT Industry Dayplanning
Hill AFB
- Cldq Quarry Building Replacementunder construction
· $1M-$10M
- Design And Build Bunkhouse At Bear River Migratory Bird Refugeunder construction
· $1M-$10M
- Dpg Maintenance And Repair Paving Idiq Contract-Section 08 And 09completed
· $1M-$10M
- Dugway Generator Replacementunder construction
· Under $1M
- F-35 T-7A East Campus Infrastructure, Hill Afb Dbb To# 8 - Fire Suppression Water Infrastructurecompleted
· $1M-$10M
- F-35 T-7A East Campus Infrastructure, Hill Afb To#7 Natural Gas Distribution Piping Systemcompleted
· $1M-$10M
- Gaoa-Cedar City Air Base Improvements Design-Buildunder construction
· $1M-$10M
- Gaoa - Rfo Fire Engine Storage Structure Replacement, Utcompleted
· Under $1M
- I-15; SB Passing Lane MP 15.0 to 20.3deadline not recorded
- Install A Vapor Intrusion Remediation System And Supporting Repairs To A Private Resident In Salt Lake City, Utah.completed
· Under $1M
- Provo Area Office Cubicle Remodel Task Ordercompleted
· $1M-$10M
- Renovate/Repair Bldg. 849 Room D10 To Improve The Computer Room Air Conditioner (Crac) Cooling Efficiency.completed
· $1M-$10M
- Tams Hma Parking Lot. To Under Hafb Paving Idiq Contract, Fa820123D0005. Contractor Shall Furnish All Materials, Labor, under construction
· Under $1M
- Ut Np Brca Path (3) Bryce Canyon Shared Use Path Multi-Use Path Construction And Drainagecompleted
· $1M-$10M
- Water Suply And Hydrant Loopcompleted
· $1M-$10M
- White Sands Campground Redevelopmentcompleted
· $1M-$10M
- Zion 240182 Construction Bus Charging Ev Phase 3completed
· $1M-$10M
- Bear River Fence & Enclosure Replacement Phase 2under construction
· $1M-$10M