Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored West Virginia projects, 86 need this division and 3 are still in planning or permitting.

As of 2026-11-03, 86 of the 300 highest-scored West Virginia projects in the SpecIndex index need concrete, and 3 of those are still in planning or permitting.

Search the full index →

Showing 1–50 of 86 · page 1 of 2

  • Hafe 304828 Repair Train Stationunder construction

    · $1M-$10M

  • Project Wv Np Neri 107(3) The Project Consists Of The Repair Of A Slide On Cunard River Access Road Using An Anchored Sounder construction

    · $1M-$10M

  • Mcdowell County Ewp 5087 Streambank Stabilization Spice Creek Sites Mcdowell County, West Virginiaunder construction

    · Under $1M

  • Construction Services For Furnishing And Installing One (1) Single Span Steel Girder, Timber Deck, And Full Width Timberunder construction

    · $1M-$10M

  • Eo 14398 The Contractor Is Required To Provide All Labor, Project Management, Materials, Tools, Supplies, And Equipment under construction

    · $10M-$50M

  • Ballistic Research Facility Workshop Annexunder construction

    · $1M-$10M

  • WVU Cancer Institute St. Joseph Regional Cancer Complexunder construction

    Wheeling · $100M+

  • Z2DA--Renovate/Upgrade Nutrition & Food Service Kitchen (VA-22-00026460)

    Martinsburg

    View specs →
  • Mcdowell County Stream Bank Stabilization Construction 5087-001under construction

    · Under $1M

  • Project Wv Erfo Fs Mngah921 2018-1(1) The Project Consists Of Roadway, Shoulder, And Slope Repairs; Repairs And Replacemunder construction

    · $10M-$50M

  • Hafe-Bldg 34&35 Exterior Rehabilitationunder construction

    · Under $1M

  • Improving Drainage For A Portion Of Fr-76 In Nicholas And Webster Counties In The State Of West Virginia.under construction

    · $1M-$10M

  • Bluestone Dam Safety Assurance, Phase 5, Hinton Wv. Modifications To Stilling Basin Using Government-Furnished Cofferdaunder construction

    · $100M+

  • Mineral County Ewp 5092 Streambank Stabilizationplanning

    · Under $1M

  • Mof Williams River At Tea Creek Bridge Replacement.under construction

    · $1M-$10M

  • Stma Window And Door Replacementunder construction

    · Under $1M

  • Ukraine. Abl Facility Construction, Equipment, And Managementunder construction

    · $100M+

  • Project Wv Np Neri 117(1): The Project Consists Of Slide Repairs At The Glade Creek Road. The Work Includes Constructingunder construction

    · $1M-$10M

  • The Objective Of This Project Is To Improve The Stability Of The Roadway Platform At The Landslide Location, Which Is Apcompleted

    · $1M-$10M

  • Construction Services Of The Institute Building At Cbp Advanced Training Center, Harpers Ferry, Wvcompleted

    · $10M-$50M

  • Morgantown, Wv- Mgw - Tower Demolition In Accordance With The Attached Specifications And Drawings.under construction

    · Under $1M

  • The Purpose Of This Contract Is To Fix Drainage Problem Areas Due To The2023 May Flood Event On Fr19 From 0.354 Miles Tocompleted

    · Under $1M

  • All Work Required To Replace Valvesunder construction

    · $1M-$10M

  • Construction Award For Instructional Design Center (Idc)/ Distance Learning Center (Dlc) Facility At Harpers Ferry, Westcompleted

    · $10M-$50M

  • Cross Lanes Amsa Construction Matoc Task Order Award.completed

    · $10M-$50M

  • Explosive Storage Magazines Ablcompleted

    · $10M-$50M

  • North Aor Macccompleted

    · $10M-$50M

  • The Contractor Shall Provide Third Party Contracting (Tpc) Services In Support Of The Port Of Spain Nec Project And Provcompleted

    · Under $1M

  • The Purpose Of This Contract Is To Fix Drainage Problem Areas Due To The 2023 May Flood Event. Fr19 Erfo Project To Insunder construction

    · Under $1M

  • City Of Paden City Wastewater Treatment Facility Improvement, Phase Ii - Section 219.under construction

    · $1M-$10M

  • Interior Renovation Of Building 309 For Operations And Trainingunder construction

    · $1M-$10M

  • Renovate Space In An Existing Two Story Facility To Support Relocation Of Maintenance Shop And Maintenance Administratiocompleted

    · $10M-$50M

  • Wv Np Neri 107(2) The Project Consists Of Granular Backfill, Mse Wall Construction, Deep Geotechnical Patches, Pipe Culvunder construction

    · $10M-$50M

  • $349M D-B/D-B-B Fuels Matoc - Sb. Camp Dawson Cmp Repairs Fy 22.under construction

    · $1M-$10M

  • Fy25 Nrp Project #11 Wv006, Va012under construction

    · $1M-$10M

  • Hafe Bus Garage_Upgrade Electric Serviceunder construction

    · $1M-$10M

  • Kearneysville Orchard Irrigation Projectunder construction

    · $1M-$10M

  • Bln Dsa Aquatic Mitigationcompleted

    · $1M-$10M

  • Renovate, Ge Spec Ct Suite Building 500completed

    · $1M-$10M

  • Renovation Of Existing Unused Hangar Facility For The Small Air Terminal/ Deployment Processing Functions, And Base Fitncompleted

    · $1M-$10M

  • Srm Jb Andrews Road Repair And Product Recovery Tank (400-Gal)completed

    · $1M-$10M

  • Wv-Natl Conserv- Water Treatment Renovationcompleted

    · $1M-$10M

  • Big Sandy River Dredge Under Regional Dredging Matoc Huntington District Usacecompleted

    · $1M-$10M

  • Eleanor Aasf, West Virginia Fueling System Repairscompleted

    · $1M-$10M

  • Evse Installationcompleted

    · $1M-$10M

  • Monongahela Nf Box Beam Bridge System Shavers Fork Forest Road 209 Culvert Replacement With Bridge For Aquatic Organism completed

    · $1M-$10M

  • Task Order For Third Party Contracting (Tpc) Services In Support Of The Athens Major Rehab Project For Electrical Enginecompleted

    · Under $1M

  • Winfield Auxiliary Ladder Replacement At Winfield Locks And Dam, Elenor Wvcompleted

    · $1M-$10M

  • Emergency Watershed Protection (Ewp) - Kanawha County Streambank Stabilization Project, West Virginiaunder construction

    · Under $1M

  • Fy24 Ohio River Open Channel Maintenancecompleted

    · Under $1M