West Virginia · Division 07
Thermal and Moisture Protection projects in West Virginia
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 113 highest-priority scored West Virginia projects, 104 need this division and 26 are still in planning or permitting.
Search the full index →- View specs →Eo 14398 The Contractor Is Required To Provide All Labor, Project Management, Materials, Tools, Supplies, And Equipment under construction
· $42.7M
- View specs →Hafe-Bldg 34&35 Exterior Rehabilitationunder construction
· $402,080
- View specs →Mineral County Ewp 5092 Streambank Stabilizationplanning
· $124,550
- View specs →Project Wv Erfo Fs Mngah921 2018-1(1) The Project Consists Of Roadway, Shoulder, And Slope Repairs; Repairs And Replacemunder construction
· $12.4M
- View specs →Improving Drainage For A Portion Of Fr-76 In Nicholas And Webster Counties In The State Of West Virginia.under construction
· $2.2M
- View specs →Mof Williams River At Tea Creek Bridge Replacement.under construction
· $3.0M
- View specs →Stma Window And Door Replacementunder construction
· $444,800
- View specs →Morgantown, Wv- Mgw - Tower Demolition In Accordance With The Attached Specifications And Drawings.under construction
· $91,442
- View specs →The Objective Of This Project Is To Improve The Stability Of The Roadway Platform At The Landslide Location, Which Is Apunder construction
· $1.2M
- View specs →The Purpose Of This Contract Is To Fix Drainage Problem Areas Due To The2023 May Flood Event On Fr19 From 0.354 Miles Tounder construction
· $285,031
- View specs →Project Wv Np Neri 117(1): The Project Consists Of Slide Repairs At The Glade Creek Road. The Work Includes Constructingunder construction
· $2.1M
- View specs →The Purpose Of This Contract Is To Fix Drainage Problem Areas Due To The 2023 May Flood Event. Fr19 Erfo Project To Insunder construction
· $120,969
- View specs →The Contractor Shall Provide Third Party Contracting (Tpc) Services In Support Of The Port Of Spain Nec Project And Provcompleted
· $659,359
- View specs →Bluestone Dam Safety Assurance, Phase 5, Hinton Wv. Modifications To Stilling Basin Using Government-Furnished Cofferdaunder construction
· $385.6M
- View specs →Ukraine. Abl Facility Construction, Equipment, And Managementunder construction
· $178.0M
- View specs →Construction Services Of The Institute Building At Cbp Advanced Training Center, Harpers Ferry, Wvcompleted
· $36.1M
- View specs →Interior Renovation Of Building 309 For Operations And Trainingunder construction
· $4.7M
- View specs →This Purchase Order Is Being Created To Provide The Payment Of The Settlement Amount Of $250,000.00 For The Low-Income Hcompleted
· $250,000
- View specs →All Work Required To Replace Valvesunder construction
· $9.1M
- View specs →Construction Award For Instructional Design Center (Idc)/ Distance Learning Center (Dlc) Facility At Harpers Ferry, Westcompleted
· $24.1M