Wyoming · Division 03
Concrete projects in Wyoming
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Wyoming projects, 109 need this division and 0 are still in planning or permitting.
As of 2026-11-03, 109 of the 300 highest-scored Wyoming projects in the SpecIndex index need concrete, and 0 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 109 · page 1 of 3
- View specs →Upgrade Roof and Paint at Ft. Washakieunder construction
FORT WASHAKIE
- Related Digital / CoreWeave Data Center Campusunder construction
Cheyenne · $100M+
- This Project Consists Of Constructing Approximately 2,216 Feet Of New 14' Roadway And Rerouting Approximately 8,384 Feetunder construction
· Under $1M
- Yell 310402 Grant Wastewater Treatment Plant And Collections And Canyon Collectionsunder construction
· $100M+
- Yell 326133 Rehabilitate Canyon Village Wastewater Treatment Systemsunder construction
· $100M+
- 0403 Gaoa 4Dk Upper Green River Corridor Road Improvements Ph 2under construction
· $1M-$10M
- Gaoa - Shell Falls Wayside Primary Power The Gaoa Funded, Shell Falls Wayside Primary Power Project Reestablishes The Siunder construction
· $1M-$10M
- Yell 326108 - Phase 3 Headworks Construcunder construction
· $1M-$10M
- Elk Fire Disaster - Burgess (Nfsr 15) And Fool Creek (Nfsr 168) Road Improvements: Road Reconstruction Of National Foresunder construction
· $1M-$10M
- Wy Flap She 26(1) Red Grade Road, Phase 1 - Construction Projectunder construction
· $1M-$10M
- Yell 338221 - Bridge Preservation - 5 Bridgesunder construction
· $1M-$10M
- Construct Helo/Trf Ops/Amu And Alert Faccompleted
· $100M+
- Construction Of Gbsd Integrated Command Center, F. E. Warren Afbunder construction
· $100M+
- Funds Construction Project Wy Nps Grte 2020(1) Moose Wilson Road Phase 2 And Wy Np Grte 11(1), Teton Park Road - Moose Tunder construction
· $10M-$50M
- Weapons Storage And Maintenance Facility, F.E. Warren Afb, Wycompleted
· $100M+
- Wy Np Grte 13(1), Repair North Park Road At Milepost 15.8. Work Includes Asphalt Surface Repair, Deep Patch, Roadway Exccompleted
· $1M-$10M
- Wy Nps Yell 12(2), Yellowstone River Bridgeunder construction
· $100M+
- 0403 Gaoa 4Dh Blackrock Rd Parking Lot Repairsunder construction
· Under $1M
- Construction Of Missile Handling Complex (Mhc), F.E. Warren Afb, Wycompleted
· $50M-$100M
- Co Omad 300(70) Minuteman Missile Access Construction Contract The Purpose Of This Contract Is For Road Construction, Incompleted
· $1M-$10M
- Wy Erfo Np Yell 2022-1(212), Yellowstone Np Northeast Entrance Road Repairs, Phase 1completed
· $10M-$50M
- Wy Nps Yell 10(23), Grand Loop Road-Old Faithful To West Thumbcompleted
· $10M-$50M
- Wy Nps Yell 14(1), Lewis River Bridgecompleted
· $10M-$50M
- Wy Tig Us212(9) Beartooth Highway Construction Contract For The Beartooth Highway Tiger Projectcompleted
· $10M-$50M
- Yell 310533 Rehabilitate And Improve Old Faithful Water Treatment System Gaoaunder construction
· $10M-$50M
- Construct Vehicle Maintenance/Aerospace Ground Equipment (Vm/Age) Complexunder construction
· $10M-$50M
- Design-Bid-Build Construction Services, Geothermal Generation (Slim Well), Ghln252910, F. E. Warren Air Force Base, Wyomcompleted
· $10M-$50M
- E.O. 14398 Mtao Bldg 28 Roof Installunder construction
· Under $1M
- Expand Emergency Departmentunder construction
· $10M-$50M
- Igf::Ct::Igf Wy Pra Yell 10(19), Grand Loop Road, Norris To Golden Gate, Phase 2completed
· $10M-$50M
- Scope Of Work Will Include Construction Activities Associated With The Connection Of Mammoth Campground To The Temporarycompleted
· $10M-$50M
- Wy Flap Nat 505 & Bl 6409(1) Casper Mtn Cir Dr & Muddy Mtn Rd 3R Construction Improvementscompleted
· $10M-$50M
- Wy Nps Grte 2017(1), Moose Wilson Road Phase 1completed
· $10M-$50M
- Construct Military Working Dog Kennel (Mwd)completed
· $1M-$10M
- Co Omad 300(68) Minuteman Missile Access Road Construction Contractcompleted
· $1M-$10M
- Co Omad 300(69) Minuteman Missile Access Construction Contract For Roadway Reconditioning And Adding Four Inches Of Aggrcompleted
· $1M-$10M
- General Construction: The Contractor Shall Provide All Labor, Materials, Equipment, And Other Services As Necessary To Cunder construction
· $1M-$10M
- Replacement Of The Runway 27 Localizer (Loc) At The Southwest Wyoming Regional Airport (Krks) In Rock Springs, Wyoming.completed
· Under $1M
- Wy Flap 740(1) Skyline Drive And Fremont Lake Roadcompleted
· $10M-$50M
- Alcova-Boysen Thermopolis-Worland Tap Opgwunder construction
· $1M-$10M
- Blm-Wy-New Fork Vault Toilet Installationunder construction
· Under $1M
- Construction Services. Work Consists Of Pulverizing The Existing Roadway, Recondition And Compact The Pulverized Surfacecompleted
· $1M-$10M
- Fort Washakie Health Center Expansion And Renovationcompleted
· $1M-$10M
- Grand Teton National Park - Trail Connector Pathwaycompleted
· $1M-$10M
- Interior Renovation Bldg 324 (Osi)-Design Build.completed
· $1M-$10M
- Wy - Buffalo Bill Complex Shopcompleted
· $1M-$10M
- Wy Flap 30400(2) Gros Ventre Road Road Construction Contract For The Gros Ventre Road In Wyoming. Follow-On Contract Acompleted
· $1M-$10M
- Wy Flap Cr Cn10-277(1) Wiggins Creek Bridge Bridge Construction 6982Af23C000037completed
· $1M-$10M
- Wy Miracle Mile Vault Constructionunder construction
· Under $1M
- 945Cm3002 Columbaria, Burial Expansion Phase 2 At Cheyenne National Cemeterycompleted
· $1M-$10M