Wyoming · Division 07
Thermal and Moisture Protection projects in Wyoming
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 129 highest-priority scored Wyoming projects, 123 need this division and 10 are still in planning or permitting.
Search the full index →- View specs →0403 Gaoa 4Dk Upper Green River Corridor Road Improvements Ph 2planning
· $1.2M
- View specs →666-26-124 Lead-Based Paint Abatement In Living Quartersunder construction
· $6.6M
- View specs →Yell 310402 Grant Wastewater Treatment Plant And Collections And Canyon Collectionsunder construction
· $109.5M
- View specs →Gaoa - Shell Falls Wayside Primary Power The Gaoa Funded, Shell Falls Wayside Primary Power Project Reestablishes The Siunder construction
· $2.0M
- View specs →Elk Fire Disaster - Burgess (Nfsr 15) And Fool Creek (Nfsr 168) Road Improvements: Road Reconstruction Of National Foresunder construction
· $2.6M
- View specs →Yell 326133 Rehabilitate Canyon Village Wastewater Treatment Systemsunder construction
· $129.2M
- View specs →Yell 326108 - Phase 3 Headworks Construcunder construction
· $6.6M
- View specs →Yell 338221 - Bridge Preservation - 5 Bridgesunder construction
· $7.4M
- View specs →Wy Np Grte 13(1), Repair North Park Road At Milepost 15.8. Work Includes Asphalt Surface Repair, Deep Patch, Roadway Excunder construction
· $1.6M
- View specs →0403 Gaoa 4Dh Blackrock Rd Parking Lot Repairsunder construction
· $125,615
- View specs →Wy Flap She 26(1) Red Grade Road, Phase 1 - Construction Projectunder construction
· $9.4M
- View specs →E.O. 14398 Mtao Bldg 28 Roof Installunder construction
· $32,500
- View specs →Funds Construction Project Wy Nps Grte 2020(1) Moose Wilson Road Phase 2 And Wy Np Grte 11(1), Teton Park Road - Moose Tunder construction
· $21.8M
- View specs →Blm-Wy-New Fork Vault Toilet Installationunder construction
· $27,351
- View specs →Co Omad 300(70) Minuteman Missile Access Construction Contract The Purpose Of This Contract Is For Road Construction, Inunder construction
· $6.0M
- View specs →Wy Miracle Mile Vault Constructionunder construction
· $228,796
- View specs →Deto 228872 - Replace Obsolete Housing With Multiplex Unitunder construction
· $4.2M
- View specs →Replacement Of The Runway 27 Localizer (Loc) At The Southwest Wyoming Regional Airport (Krks) In Rock Springs, Wyoming.under construction
· $312,921
- View specs →Weapons Storage And Maintenance Facility, F.E. Warren Afb, Wycompleted
· $162.3M
- View specs →Construct Helo/Trf Ops/Amu And Alert Faccompleted
· $133.9M