MICRON ID1 - B173 RAW/NPW Pumphouse Foundation
Executive brief
(MICRON ID1 B173 RAW/NPW PUMPHOUSE FOUNDATION) (ESC22-00984) Permit for Structural Foundation only for B173 RAW/NPW Pumphouse footing/foundation. No vertical construction is allowed. Scope of work: building footing/foundation, underground services including storm/Sewer drains, water piping, electrical/telecom, and grounding. Work is allowed to be done at the owner’s risk; any items found to be not in compliance upon approval of the plans shall be corrected prior to any further work being completed. Special Inspections required per attached Form 310. Main building permit under BLD26-00765. Grading permit under GRD26-00017. *JHB*. (MICRON ID1 B173 RAW/NPW PUMPHOUSE) (Foundation Permit BLD26-01768) PROJECT MANAGEMENT - Joe Bruce** Permit to construct a one story 13,000 sq ft Pumphouse building. Work to include footing and foundation, structural framing, exterior EIFS panel envelope, full interior build-out including underground and above ground mechanical, electrical, and plumbing work within 5 ft of building footprint; and interior finishes to comply with Ch. 8 of the 2018 IBC. Special inspections required, see 310 form uploaded. The building will be fully Fire Sprinklered. **JG** Mechanical commissioning report shall be submitted to mechanical supervisor for final mechanical approval.TJ