Connecticut · Division 21
Fire Suppression projects in Connecticut
Sprinklers, ESFR, deluge, fire protection. Usually specified by the fire protection engineer. Counted across our 300 highest-priority scored Connecticut projects, 55 need this division and 50 are still in planning or permitting.
As of 2026-11-03, 55 of the 300 highest-scored Connecticut projects in the SpecIndex index need fire suppression, and 50 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 55 · page 1 of 2
- View specs →MAJOR REPAIRS BOILER PLANT
New London
- View specs →Black Rock Lake Electrical Modifications (Thomaston, CT)
THOMASTON
- View specs →National Roofing Program FY20 Project #15
Middletown
- View specs →REPLACE ROOF MUNRO HALL USCG ACADEMY NEW LONDON CT PROJECT #2524388
NEW LONDON
- View specs →Replace Roof Shop Buildings USCG Academy, New London, CT
NEW LONDON
- View specs →Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
Newington
- Westhill High School Replacementunder construction
Stamford · $100M+
- View specs →Renovation and mechanical room addition of the Betances Learning Lab Magnet Schoolpermitting
Hartford · $10M-$50M
- StoneRidge Senior Living Mystic Expansionunder construction
Mystic · $50M-$100M
- View specs →AASF Fire Suppression Building
Windsor Locks
- View specs →Aircraft Deice Paddeadline not recorded
EAST GRANBY
- View specs →B430 & B434 Replace Fire Alarm Systems
Groton
- View specs →Building 17 Replace Elevator and Associated Electrical Work
- Construction of willow creek phase 4 2 three story buildings consisting of 56 residential unitspermitting
Hartford · $10M-$50M
- View specs →B564 INSTALL CWP EVAPORATOR
Groton
- Furnish and install electrical systems per PE stamped drawings including; select electrical demolition, temporary power permitting
Hartford · $1M-$10M
- Install a roof mounted PV array on the A level roof. (NFPA 70 2020)permitting
Hartford · $1M-$10M
- View specs →N045--Building 2 steam supply double block and bleed station
West Haven
- View specs →NEX B428 Underground Storage Tanks
Groton
- View specs →Refurbish/Repaint Antenna Towersunder construction
Shelton
- View specs →Replace and Install New Carpet Tile
NEW LONDON
- View specs →SOURCES SOUGHT FOR ROOF REPLACEMENT LOCATED AT HARTFORD, CT.planning
Hartford
- View specs →Y1DZ-- Construct New Inpatient Pharmacy West Haven
West Haven
- View specs →Z2DA--689-21-111 Upgrade OR Utilities Construction at VA West Haven, CT
West Haven
- DATA, CLOCKS, AV AND PApermitting
Hartford · $1M-$10M
- Demolition of 150 Windsor Street Above and Below Grade 2 Phases 1st Phase Demolition of Chiller Building less than 6permitting
Hartford · $1M-$10M
- View specs →Electrical Rebuild, Black Rock Lake Dam, Thomaston, Connecticutunder construction
Thomaston
- New 71k SF educational facility for Pre-K-Fifth. includes sitework improvements.permitting
Hartford · $10M-$50M
- New controller, New fixtures, New door operator, New cab interior, New AC Motorpermitting
Hartford · Under $1M
- OSB Phase II Removal of existing non load bearing drywall partitions, acoustical ceiling, flooring, millwork and doors/permitting
Hartford · $1M-$10M
- Real Arts Way - BBE Job #263373 HVAC/mechanical renovation and expansion work for Real Art Ways located at 56 Arbor Strpermitting
Hartford · $1M-$10M
- REPLACEMENT OF DETERIORATED PIPINGpermitting
Hartford · $1M-$10M
- ADD ELEVATOR EXPAND KITCHEN AND RESTROOMSpermitting
Hartford · $1M-$10M
- View specs →Control System Replacement for Stamford Hurricane Barrier, Stamford, CTplanning
Stamford
- Demolition of 216 Washington Building and one (1) underground storage tank.permitting
Hartford · Under $1M
- Electrical wiring of new building,permitting
Hartford · $1M-$10M
- Finish & Installation of new Audio Visual (AV) Systempermitting
Hartford · $1M-$10M
- HVAC SCOPE OF WORK PER PLANS AND SPECS OF A NEW SCHOOL. WORK PERFORMED WILL MEET THE FOLLOWING STANDARDS: 2020 NFPA permitting
Hartford · $1M-$10M
- New parking garage. General power, lighting and fire alarm.permitting
Hartford · $1M-$10M
- Receive/ Install all BBE Solar provided Equipement. Conduit distribution system, distribution cabling & terminationspermitting
Hartford · $1M-$10M
- Approximately 128,000 sq/ft of processing area and approximately 16,000 sq/ft of office space fit out, consisting of a npermitting
Hartford · $1M-$10M
- View specs →BUILDING MANAGEMENT SYSTEM PREVENTATIVE MAINTENANCEplanning
East Granby · Under $1M
- Complete renovation and addition to the EB Kennelly School.permitting
Hartford · $50M-$100M
- Cost: $709,000 Scope: Install new plumbing piping, equipment, fixtures and specialties per plans and specifications. Bpermitting
Hartford · Under $1M
- Design/Build Recapitalize Central Steam Distributions At United States Coast Guard Academy, New London, Ctunder construction
· $10M-$50M
- Design, provide, & install wet fire sprinkler system and dry fire sprinkler systems for the proposed garage per NFPA 13 permitting
Hartford · $1M-$10M
- Install (1) pad mounted sub-panel, (5) Musco bases and poles and Install site lightingpermitting
Hartford · Under $1M
- Installation of new balcony railings with privacy screens. Steel fascia repairs and coating. Installation of exterior clpermitting
Hartford · $1M-$10M
- View specs →J041--Condensate Pump Replacements
West Haven
- New 9 Level precast parking garage with future retail or restaurant space on the first level. FM REQUIRED FOR ROUGH-IN Ipermitting
Hartford · $10M-$50M