Connecticut · Division 07
Thermal and Moisture Protection projects in Connecticut
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Connecticut projects, 285 need this division and 282 are still in planning or permitting.
Search the full index →- View specs →Construction of willow creek phase 4 2 three story buildings consisting of 56 residential unitspermitting
Hartford · $14M
- View specs →Furnish and install electrical systems per PE stamped drawings including; select electrical demolition, temporary power permitting
Hartford · $1.5M
- View specs →Demolition of 150 Windsor Street Above and Below Grade 2 Phases 1st Phase Demolition of Chiller Building less than 6permitting
Hartford · $1.6M
- View specs →New controller, New fixtures, New door operator, New cab interior, New AC Motorpermitting
Hartford · $724,995
- View specs →Real Arts Way - BBE Job #263373 HVAC/mechanical renovation and expansion work for Real Art Ways located at 56 Arbor Strpermitting
Hartford · $1.3M
- View specs →REPLACEMENT OF DETERIORATED PIPINGpermitting
Hartford · $1.3M
- View specs →DATA, CLOCKS, AV AND PApermitting
Hartford · $1.2M
- View specs →Demolition of 216 Washington Building and one (1) underground storage tank.permitting
Hartford · $719,280
- View specs →Finish & Installation of new Audio Visual (AV) Systempermitting
Hartford · $1.3M
- View specs →Install a roof mounted PV array on the A level roof. (NFPA 70 2020)permitting
Hartford · $3.6M
- View specs →Remaining new apartment units being created in an existing building per architectural drawings. Work is related to RES-Apermitting
Hartford · $120,000
- View specs →STELL CANOPY STRUCTURE INSTALLATION TO COVER EXISTING GANTRY CRANEpermitting
Hartford · $100,000
- View specs →Install (1) pad mounted sub-panel, (5) Musco bases and poles and Install site lightingpermitting
Hartford · $275,958
- View specs →INSTALL (2) ACCEL CS LP BOILERS 220,000 BTU EACH IN. BASEMENT OF BUILDING. Removing steam heat exchanger and capping stepermitting
Hartford · $85,445
- View specs →NEW ADDITION ALTERNATE AND ADD 7 UNIT TO EXISTING BUILDINGpermitting
Hartford · $216,360
- View specs →Receive/ Install all BBE Solar provided Equipement. Conduit distribution system, distribution cabling & terminationspermitting
Hartford · $1.0M
- View specs →Replace Hvac Satterlee Hall At The U.S. Coast Guard Academy, New London, Ct (New London County), Project No. 21590948under construction
· $17.1M
- View specs →Rewire existing building and install new 1600 Amp service.permitting
Hartford · $250,000
- View specs →Roof replacement: Remove and dispose of existing roofing assembly down to existing metal decking, Mechanically attach (2permitting
Hartford · $155,900
- View specs →RTU Replacement, minor duct modification.permitting
Hartford · $40,000