Connecticut · Division 23
HVAC projects in Connecticut · page 2
Heating, cooling, ventilation, chillers, VRF. Usually specified by the mechanical engineer. Counted across our 300 highest-priority scored Connecticut projects, 79 need this division and 61 are still in planning or permitting.
As of 2026-11-03, 79 of the 300 highest-scored Connecticut projects in the SpecIndex index need hvac, and 61 of those are still in planning or permitting.
Search the full index →Showing 51–79 of 79 · page 2 of 2
- New 9 Level precast parking garage with future retail or restaurant space on the first level. FM REQUIRED FOR ROUGH-IN Ipermitting
Hartford · $10M-$50M
- New parking garage. General power, lighting and fire alarm.permitting
Hartford · $1M-$10M
- Receive/ Install all BBE Solar provided Equipement. Conduit distribution system, distribution cabling & terminationspermitting
Hartford · $1M-$10M
- Remaining new apartment units being created in an existing building per architectural drawings. Work is related to RES-Apermitting
Hartford · Under $1M
- Remove loose rock. Install 1/2" dens deck. Install Vacuseal .060 TPO roof system. Includes 20 year manufacturer's labpermitting
Hartford · Under $1M
- 9 TIER PARKING GARAGE, 42,200SQ GARAGE IS CONSIDERED ENCLOSED. RETAIL SPACES ARE PLANNED FROM GROUND FLOOR TO TIER 3.permitting
Hartford · $10M-$50M
- Address: 80 Seymour Street- Conklin Building 1st floor Owner: Hartford Healthcare Building Use group: I-2 (institupermitting
Hartford · Under $1M
- Base Pricecompleted
· $10M-$50M
- BQ-455 Renovations and Repairs, Naval Submarine Base New Londonunder construction
Groton · $10M-$50M
- Cost: $709,000 Scope: Install new plumbing piping, equipment, fixtures and specialties per plans and specifications. Bpermitting
Hartford · Under $1M
- Design Build Chase Hall Barracks Annex D Mid-Life Renovations Phase Vi, At U.S. Coast Guard Academy, New London, Ct.under construction
· $10M-$50M
- Design&Construction For Chase Hall C Annexcompleted
· $10M-$50M
- Design, provide, & install wet fire sprinkler system and dry fire sprinkler systems for the proposed garage per NFPA 13 permitting
Hartford · $1M-$10M
- Electrical upgrades of South Meadow pump station.permitting
Hartford · Under $1M
- Electrical upgrades to North Meadow pump station. This work includes a temporary electrical service.permitting
Hartford · Under $1M
- FRED D. WISH MUSEUM SCHOOL - FIRE ALARM, SITE LIGHTING, SECURITY/BDA SYSTEMSpermitting
Hartford · Under $1M
- Installation of new balcony railings with privacy screens. Steel fascia repairs and coating. Installation of exterior clpermitting
Hartford · $1M-$10M
- View specs →J041--Condensate Pump Replacements
West Haven
- Phase iV Willow Creek Foundation only for 2 apartment buildings building L 41 units 3 story building. Building M 15 unipermitting
Hartford · $1M-$10M
- Plumbing renovations as specified for Jones Hall Dorm Rm to include demo, piping, insulation, and fixturespermitting
Hartford · Under $1M
- Purchase and install specified lighting, branch wiring and controls, underground conduits and hand holes for power, emptpermitting
Hartford · Under $1M
- Relocation And Renovation Of Sterile Processing Services Minor Construction Project At The West Haven Vamc In West Havenunder construction
· $10M-$50M
- Rewire existing building and install new 1600 Amp service.permitting
Hartford · Under $1M
- Roof replacement: Remove and dispose of existing roofing assembly down to existing metal decking, Mechanically attach (2permitting
Hartford · Under $1M
- Scope: Install new HVAC equipment, ductwork, ventilation, low voltage control wiring/thermostats, and all accessories pepermitting
Hartford · Under $1M
- STELL CANOPY STRUCTURE INSTALLATION TO COVER EXISTING GANTRY CRANEpermitting
Hartford · Under $1M
- Temporary Facilities To Support New Surgical And Clinical Space Tower For The Department Of Veterans Affairs Connecticutunder construction
· $10M-$50M
- Y1DA--SPS Relocation and Renovation Minor #689-408 - West Havenunder construction
West Haven · $10M-$50M
- 1. Adhere to all CREC’s, local code and OSHA’s safety requirements. 2. Remove existing system down existing decking. 3. permitting
Hartford · $1M-$10M