Idaho · Division 03
Concrete projects in Idaho
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Idaho projects, 120 need this division and 5 are still in planning or permitting.
As of 2026-11-03, 120 of the 300 highest-scored Idaho projects in the SpecIndex index need concrete, and 5 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 120 · page 1 of 3
- Design Build Construction Contract To Modernize The Porthill Land Port Of Entryunder construction
· $50M-$100M
- Construction, Disaster, Anderson Creek Bridge Replacement. This Project Replaces The Anderson Creek Bridge Which Burnedplanning
· Under $1M
- Replace Aging Timber Bridge With New Steel Bridge Which Includes Gsr Abutments.planning
· Under $1M
- Borah Trailhead/Campground Renovation - Salmon Challis National Forestplanning
· Under $1M
- This Project Consists Of Remodeling An Existing Facility For The Salmon-Challis National Forest At The North Fork Rangeunder construction
· $1M-$10M
- Bannock Pumping Plant Rehabilitationunder construction
· $10M-$50M
- Culvert Replacements For Forest Road 250.under construction
· Under $1M
- 0412 Const West Fork Weiser Resurfacing, Award Under R4 Road Matocunder construction
· Under $1M
- Construction, Erfo, Bridge Replacement This Project Replaces The Little Weiser Bridge, Which Was Burned In The Lava Firunder construction
· Under $1M
- Nifc Building 415 Replacementunder construction
· $1M-$10M
- 0412 Dis Const Lava Fire Resurfacing Award With R4 Roads Matocunder construction
· $1M-$10M
- Mesa Falls Trail Pavingunder construction
· Under $1M
- 0415 Goao 4Gh Const Mesa Falls Road Maintenance Project: Statement Of Work The Project Is Located On The Upper Mesa Fallunder construction
· Under $1M
- Lateral Move Irrigation Systemunder construction
· Under $1M
- W68Md961115992under construction
· $10M-$50M
- 0402 Const National Forest System Road #625 Road Repairsunder construction
· $1M-$10M
- Gaoa Lolo Motorway Historic Road Maintenanceunder construction
· Under $1M
- View specs →Big Smoky Hybrid Electrical System Upgrade and Building Foundation Improvements
- Funds Construction Project Id Fs Nezpr117 221(1), National Forest System Road 221 Rehabilitationcompleted
· $1M-$10M
- Gospel Hump Area Projects, Nez Perce Clearwater National Forest - This Contract Is For Maintenance Along The Crooked Rivunder construction
· Under $1M
- Lava Fire Rangeland Fence Infrastructure Reconstruction - Repairs To 2.5 Miles Of Fences Destroyed By Lava Fire. Projecplanning
· Under $1M
- 0412 Const New Zena Secesh Watershed Restoration Extensionunder construction
· Under $1M
- Pih Atct Design-Build. This Contract Is To For The Design And Build Of A New Airport Traffic Control Tower (Atct) At Pocunder construction
· $50M-$100M
- Project 1. Replace An Existing Culvert On Nfsr 1900-4.20 With A Structural Steel Plate Arch Pipe Designed To Pass Aquatiunder construction
· Under $1M
- Sage Hen Recreation Area Reconstruction - Phase Iii. This Project Reconstructs The Hollywood And Antelope Campgrounds Atunder construction
· $1M-$10M
- Snake River Field Station Electrical Upgrade In Boise, Idunder construction
· Under $1M
- Sunbeam Dam Stairsunder construction
· Under $1M
- This Solicitation Is For A Design-Bid Construction Project Of A Grandview Gate Entry Control Facility, Mountain Home Airunder construction
· $1M-$10M
- Construction Services For Project Id Boundary 5806 (3)B, Riverside Road Improvements B. The Work Consists Of Grading, Drunder construction
· $1M-$10M
- Construct Water Treatment Plantcompleted
· $50M-$100M
- Funds Construction Project, Id Flap Bonner 841(1), Trestle Creek Road, Mp 100 To 103.7. Work Includes Bank Stabilizationunder construction
· $1M-$10M
- Snake River Cemetery Expansion Constructionunder construction
· $1M-$10M
- 0415 Gaoa 4Gg Lower Mesa Falls Chip Sealunder construction
· Under $1M
- Construction Services For Wfl Project Id Clark 6805(1), Yale-Kilgore Road, Mp 9 To 16.9 & Id Fremont 6805(1), Yale-Kilgocompleted
· $10M-$50M
- Funds Construction Project Id Bor Srao Tcrown(1), Crown Point Trail And Parking Area. Work Includes Trail Construction, completed
· $1M-$10M
- Replace Aging Treated Timber Bridge With New Concrete Bridgeunder construction
· Under $1M
- 531-22-103 Add Parking On Parade Groundsunder construction
· Under $1M
- Funds Construction Contract Id Flap Fs Sc Multi(1), Custer Motorway Stabilization Project, Schedule Bcompleted
· $1M-$10M
- Shoshone Wildland Fire Operations And Field Officeunder construction
· $10M-$50M
- This Requirement Is For Renovation Of B1529 And B1530 On Gowen Field, Boise, Id. The Renovation Includes Removal Of Higcompleted
· $10M-$50M
- 531-24-101 Renovate Building T111completed
· $1M-$10M
- Acquisition For Rehabilitation Of The Bridge Crane In The Afd Powerhouse.under construction
· $1M-$10M
- Black Canyon Switchyard And Station Service Upgradesunder construction
· $1M-$10M
- Crmo 323904, Rehabilitate Operational Buildings At Idaho Parksunder construction
· $1M-$10M
- Formosa Mine Superfund Site Removalunder construction
· $1M-$10M
- Gaoa - Water Delivery System Upgrade For Camas Nwrcompleted
· $1M-$10M
- Id Fs Erfo 2017(1)-29(1), Stoddard Bridgecompleted
· $10M-$50M
- Task Order Under R1 Road & Bridge Matoc For St. Joe Road Repairs And Maintenance Base Item Work Includes Selective Cleaunder construction
· Under $1M
- This Project Includes, A Precast Concrete Arch Structure, Mse Walls Connecting To The Concrete Arch Structure, 8-Foot Tacompleted
· $1M-$10M
- 531-23-101 Replace Energy Management Systemcompleted
· $1M-$10M