Idaho · Division 03

Concrete projects in Idaho · page 2

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Idaho projects, 125 need this division and 5 are still in planning or permitting.

As of 2026-11-03, 125 of the 300 highest-scored Idaho projects in the SpecIndex index need concrete, and 5 of those are still in planning or permitting.

Search the full index →

Showing 51–100 of 125 · page 2 of 3

  • Chicago Erosion Shoreline Upper Portion Repaircompleted

    · $1M-$10M

  • Coeur D'Alene Greenhouse Nursery Modernization On The Idaho Panhandle National Forest Phase 1 & Phase 2completed

    · $1M-$10M

  • Fabricate And Deliver Emergency Gate Hoistscompleted

    · $1M-$10M

  • Fund Construction Project Id Flap Canyon Multi(1), Indiana And Orchard Shared Roadway. This Work Consists Of Shoulder Wicompleted

    · $1M-$10M

  • Gaoa 0415 Const Teton Canyon Bridge Replacementsunder construction

    · Under $1M

  • Id Dot T 33(1) Idaho Teton Centennial Trail And Wy Dot 22(1) Wyoming Teton Pass Centennial Trailcompleted

    · $1M-$10M

  • Id Flap Idaho Nf17(1), Mt. Idaho Grade Road Rehabilitation. This Work Consists Of Road Rehabilitation With Recycled Aspcompleted

    · $1M-$10M

  • Igf::Ot::Igf Nogrn Minidoka National Historic Site Miin 159776 - Reuse Warehouse For Visitor Contact Stationcompleted

    · $1M-$10M

  • Nifc 440 Boise Air Center Constructioncompleted

    · $1M-$10M

  • Project 531-21-102 Correct Mechanical Electrical Deficiencies For The Boise Vamc, Boise, Id Under The Visn-20 Constructiunder construction

    · $1M-$10M

  • Renovate Step Down Unit, Bldg 67 531-20-101completed

    · $1M-$10M

  • 0412 Const D6 Big Creek Water System Upgrades (Replaces Fy23 Req# 1096083)completed

    · $1M-$10M

  • 531-24-103 Replace R22 Chillerscompleted

    · $1M-$10M

  • Construction Services For Project Id Erfo Nezpr117 2019-1(1), Nez Perce-Clearwater 2019 Repairscompleted

    · $1M-$10M

  • Disaster Recovery - This Project Consists Of Design, Purchasing, Delivering And Installing A 40-Foot Span Prefabricated under construction

    · Under $1M

  • Expand Pharmacy Constructionunder construction

    · $1M-$10M

  • Funds Construction Project: Id Flap Shosho Multi(1), Coeur D Alene River Road And Prichard Creek Roadcompleted

    · $1M-$10M

  • Id Fs Erfo 2016(1)-27(1), Idaho Panhandle Repairs 2016completed

    · $1M-$10M

  • Id - Hagerman National Fish Hatchery (Hnfh) And Magic Valley Fish Hatchery (Mvfh) Asphalt Projectscompleted

    · $1M-$10M

  • Id-Minidoka Nwr-Db Contract For New Shopcompleted

    · $1M-$10M

  • Lapwai Nia Well Replacementcompleted

    · $1M-$10M

  • Rehabilitate The Spillway Gate Assemblycompleted

    · $1M-$10M

  • Repair Aproncompleted

    · $1M-$10M

  • Blonde Timber Road Reconstruction Projectunder construction

    · Under $1M

  • Clin 0002 - Full Replacement Of Campgroucompleted

    · $1M-$10M

  • Construct New Farm Shop Building---Community Based Funded Projectcompleted

    · Under $1M

  • Design Build Morgantown Cooling Tower Replacementcompleted

    · $1M-$10M

  • Dwa Dent Acres & Lla Lewiston Levies Repavingcompleted

    · Under $1M

  • Gaoa Spokane Historic Building Stabilizationcompleted

    · $1M-$10M

  • Task Order To Fabricate And Install Replacement Spalding Visitor Center Museum Exhibits Against Established National Parcompleted

    · $1M-$10M

  • Upper Snake River Field Office Hvac Renovation Projectcompleted

    · $1M-$10M

  • 0412 Const Mann Creek Culvert Replacement Utilizing Ferm Bpa Payette National Forest - Region 4 - Zone 4completed

    · Under $1M

  • 531-23-108, Replace Ceilings 46 & 67, Boise, Idaho Vamccompleted

    · Under $1M

  • 531-Csi-106 Remodel For 2Nd Ct Obligation 531C45179completed

    · Under $1M

  • Construction Of Project 531-24-108 Upgrade Storm Sewer Systemcompleted

    · Under $1M

  • Construction Project Id Bor Srao 0017(1), Sportsman'S Park Transportation Improvements. Work Consists Of Fdr, Paving, Stcompleted

    · Under $1M

  • Gaoa Bayhorse Recreation Site Repairscompleted

    · Under $1M

  • Gaoa - Beehive Bend Boat Takeout & Walkwaycompleted

    · Under $1M

  • Gaoa Coeur D'Alene Site Furnishingscompleted

    · Under $1M

  • Gaoa Cove Boat Ramp And Shoreline Stabilizationcompleted

    · Under $1M

  • Gaoa Project Consists Of Furnishing And Installing (Including Excavation And Backfill) Precast Concrete Toilet Buildingscompleted

    · Under $1M

  • Id Hagerman Nfh Spring Water Seepunder construction

    · Under $1M

  • Id-Mccall Fish Hatchery-Holding Pondscompleted

    · Under $1M

  • Morgan Bridge Riparian Restoration Design-Build - Iracompleted

    · Under $1M

  • Priority Landscape, Burpee Pit Crushing (2023), Red River Ranger District, Nez Perce-Clearwater National Forests.completed

    · Under $1M

  • Repaving Parking Lots 2 And 7, Project Number 531-23-107, At Boise Vamc, Boise, Idcompleted

    · Under $1M

  • Replacement Of Mores Creek Bridge. Existing Bridge Has Significantly Degraded And Is Becoming A Public Safety Hazard.under construction

    · Under $1M

  • Replace Teledyne Rvr With Pc Based Rvr Rwy 3/21 Pocatello, Idaho (Pih)-Idcompleted

    · Under $1M

  • Replacing Hvac System At The Rcew Project Range Bldg Murphy Idcompleted

    · Under $1M

  • Road Construction To The Buffalo Campground Access Road With Base Items And Options. Intent Is To Be Awarded Utilizing Rcompleted

    · Under $1M