Idaho · Division 03

Concrete projects in Idaho · page 3

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Idaho projects, 125 need this division and 5 are still in planning or permitting.

As of 2026-11-03, 125 of the 300 highest-scored Idaho projects in the SpecIndex index need concrete, and 5 of those are still in planning or permitting.

Search the full index →

Showing 101–125 of 125 · page 3 of 3

  • Road Maintenance And Repair For Fsr 230 And Fsr630under construction

    · Under $1M

  • Roof Replacement, Phase 2completed

    · Under $1M

  • The Contractor Shall Complete Replacement Of The Automatic Tank Gauge (Atg) And Leak Detection/System Associated With Thcompleted

    · Under $1M

  • The Vendor Shall Supply All Material, Labor, And Supervision To Complete Phoenix Firearms Range As Specified In Proposacompleted

    · Under $1M

  • 0402 Const Rock Creek Culvert Replacement - Uppercompleted

    · Under $1M

  • 0414 Const New Big Smoky Foundation Improvementscompleted

    · Under $1M

  • Buttermilk And Island Park Boat Ramp Replacementscompleted

    · Under $1M

  • Cedar Point Camp Host Site Improvementcompleted

    · Under $1M

  • Const Baer Lava Fire Emergency Treatments. Road Treatments To Protect Road Surfaces From Post Fire Eventscompleted

    · Under $1M

  • Gaoa Forest-Wide Toilet Decommission And Installation Projectcompleted

    · Under $1M

  • Id-Fws Kooskia Nfh-Control Valvescompleted

    · Under $1M

  • Id-Sawtooth Nfh-Qtrs Roofingcompleted

    · Under $1M

  • Minnetonka Cave Overlook Deck & Other Improvements Project (Gaoa)completed

    · Under $1M

  • North Fritz Creek Culvert Replacementunder construction

    · Under $1M

  • Replace Overhead Doors, Central Ferry Electrical, And Screenhouse Repairscompleted

    · Under $1M

  • Salmon, Id - (Lkt) Vor New Fence Installation Project In Accordance With The Sow, Specifications, And Drawings.completed

    · Under $1M

  • This Project Will Complete The Road Work To Bring The Roads To Safe Haul Status For The Dead Post Timber Sale By Replaciunder construction

    · Under $1M

  • Washout Road Repairunder construction

    · Under $1M

  • Water Trough Replacement In The Area Effected By The Badger Firecompleted

    · Under $1M

  • 0402 Const Boise Cmlg Lime Creek Trail Bridgecompleted

    · Under $1M

  • Blackwell Island Lift Station And Lighting Upgradescompleted

    · Under $1M

  • Burnt Creek Exclosure Fence Constructionunder construction

    · Under $1M

  • Challis Bridge Site Maintenancecompleted

    · Under $1M

  • Construction Of Vertical Lift, Pocatello Supply Depotcompleted

    · Under $1M

  • Elk Creek Bridge Replacement, Caribou-Targhee National Forest Replacement Of Existing Bridge With New 22' Pre-Cast Conccompleted

    · Under $1M