Maryland · Division 26
Electrical projects in Maryland · page 2
Lighting, switchgear, generators, distribution. Usually specified by the electrical engineer. Counted across our 300 highest-priority scored Maryland projects, 123 need this division and 37 are still in planning or permitting.
As of 2026-11-03, 123 of the 300 highest-scored Maryland projects in the SpecIndex index need electrical, and 37 of those are still in planning or permitting.
Search the full index →Showing 51–100 of 123 · page 2 of 3
- View specs →CBR B154 & B164 CONSTRUCTION, INDIAN HEAD MD
Indian Head
- View specs →Design Build Fci Leavenworthcompleted
· $100M+
- Design-Builds Services For The Fda White Oaks Campus Security Upgrade Project In Silver Springs, Marylandunder construction
· $1M-$10M
- View specs →Jennings Randolph Tainter Gate Upgrade
- New Burn Range Buildingunder construction
· $1M-$10M
- Nist B202 Gsa Roofing Task Orderunder construction
· $1M-$10M
- Nist B231 Gsa Roofing Task Orderunder construction
· $1M-$10M
- View specs →Roof Replacement at Joint Base Andrews Naval Air Facility Washington
JB Andrews
- Rtc Awardunder construction
· Under $1M
- View specs →SPECIALIZED MATERIAL FABRICATION BUILDING
Fort George G Meade
- The Principal Purpose Of This Requirement Is To Perform A Roof Replacement Of Building 07 Located At Nasa Goddard Space under construction
· $1M-$10M
- C105559: This Contract Allows For Tighter Control Of The Airflows In This Facility. The Work Includes Replacement Of Mulunder construction
· $1M-$10M
- C115299 - Provide Wheelchair Access To Front Lobby Of Nlm Bldg 38 From The Parking Area.under construction
· $1M-$10M
- C201937-Cup Preventive Maintenanceunder construction
· $1M-$10M
- C202049 Cogen Cup Scada Upgrades And Boiler Monitoring Camerasunder construction
· $1M-$10M
- C202064 - Niaid Conference Room Expansion, Building 31Aunder construction
· $1M-$10M
- C202072 Building 4 Roof Repairsunder construction
· $1M-$10M
- C202271 - The Purpose Of This Task Order Award Is To Provide Reliable Power To The Nih Children'S Inn From B59B.under construction
· $1M-$10M
- Construct Ehrm Infrastructure Upgrades - Baltimore, Mdunder construction
· $10M-$50M
- View specs →Construct EHRM Infrastructure Upgrades - Baltimore, MD
- Od Space And Facilities Management Move Support Servicesunder construction
· Under $1M
- Psc Perry Point Bldg 14 Office Repairunder construction
· Under $1M
- Rowan Bauxite I Data Center, Frederick Countyunder construction
Frederick · $100M+
- Various Asphalt Repairs At Fletc Cheltenham Md.under construction
· $1M-$10M
- Wallops Multiple Award Construction Ii Task Order Building 28 Roof Antenna Replacement.under construction
· Under $1M
- C116559 -The Complete Demolition Of Buildings 61 And 61A, Associated Infrastructure And Restoration Of The Site To Greenunder construction
· Under $1M
- C201671 - Design And Renovate Section Of Lab Be11 In B33 To Accommodate A New Talos Electron Microscope.under construction
· Under $1M
- C201707: This Project Provides Design And Construction Services To Replace One Of The 5 Turnstiles Into A Second Sallypounder construction
· Under $1M
- C201709 Ventilation Upgrades At The Cup Phases 2 And 3under construction
· $1M-$10M
- C201735-Office And Kitchen Renovation, Bldg 3, 5Th Floorunder construction
· $1M-$10M
- C201824-Full Preventive Maintenance Service Of All Industrial Chillers To Identify Potential Maintenance Concerns And Enunder construction
· $1M-$10M
- C202077 - Pharmacy Hood Replacement, Building 10under construction
· Under $1M
- C202119 Building 4 3Rd And 4Th Floor Restrooms Renovationsunder construction
· Under $1M
- Choh Fy26 Seneca And Pennyfield Pavingunder construction
· Under $1M
- Customer Wants To Use ePlans,A 5-STORY MIXED USE RESIDENTIAL MULTIFAMILY BUILDING WITH 200 UNITS & 22,220 SF OF RETApermitting
Bethesda · $10M-$50M
- Ics Network Repairs Phase 2 - This Project Consists Of Providing Design, Installation, Configuration And Commissioning Aunder construction
· $1M-$10M
- Overlay Existing Nevo Pad And Restripe Drivers Training Track At Fletc Cheltenham Md.under construction
· Under $1M
- C201461 - To Perform A Complete Boiler 3 Turbine Assessment And Repair To Restore Equipment Condition, Improve Operatingunder construction
· Under $1M
- C202541 - Building 14H Water Heater Replacementunder construction
· Under $1M
- Phase Ii Construction For P-691 Aircraft Development And Maintenance Facility, Nas Pax Riverunder construction
· $100M+
- Req 7470570; C200707- Building 13 Rm 3W86under construction
· Under $1M
- Roof Repair/Replacement - Mdunder construction
· Under $1M
- Stipend For Rfp Response, Ou19-Fy26-013-Newunder construction
· Under $1M
- Assateage Island National Seashore - Install Comfort Stations At Day Use Areasunder construction
· Under $1M
- C201897 - Design-Build Services,Evaluation, Design, Fabrication, Delivery, Installation, Testing, And Commissioning Of Nunder construction
· $1M-$10M
- C201922 - Convert Cold Box Room To Insect Husbandry, Building 6Bunder construction
· Under $1M
- C202451 Replace Water Heaters And Related Equipment Located In The B2 Level Mer, Bldg 49under construction
· Under $1M
- View specs →Centers for Medicare & Medicaid Services Headquarters (CMS) Back on Campus-Phase 4
Baltimore
- Customer Wants To Use ePlans, A new construction facility containing 100 resident rooms for assisted living and memory cpermitting
Potomac · $10M-$50M
- The Project Is To Widen Venona Rd, From A Two-Lane Undivided Road To A Four-Lane Divided Roadway Installation Of Vehiculunder construction
· $10M-$50M